
Cementitious pool waterproofing in Prince Muhammed Ibn Saud
Cementitious pool waterproofing in Prince Muhammed Ibn Saud begins with a pool photo and its location, sent by call or WhatsApp. The district holds villas and apartment blocks with pools of different sizes and ages, each needing separate inspection.
The district mixes older pools in older villas with newer pools in newer apartment blocks, so concrete conditions vary widely. Older pools often have wide cracks and leaks at joints, while newer ones may only need coating renewal. Intense summer heat stresses exposed concrete, and coastal humidity nearby may slow drying time. Photos clearly show each pool's state before the right steps are chosen.
- Prince Muhammed Ibn Saud is a district in the Eastern Province, close to Ar Rabie, Dammam and Madinat Al Ummal, with villas and apartment blocks.
- Pools in the district may sit on rooftops or below ground, and each location requires different concrete and coating treatment.
The main items of cementitious pool waterproofing in Prince Muhammed Ibn Saud
- Closing return pipe openings and drain outlets before the coating goes on
- Wet curing after application so the coating sets correctly
- Treating hairline cracks and the wall-to-floor junction
- Applying the flexible cementitious layer over the whole shell
From first contact to the finished job in Prince Muhammed Ibn Saud
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
Start from Prince Muhammed Ibn Saud with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Prince Muhammed Ibn Saud comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Prince Muhammed Ibn Saud
Can an underground pool in the district be waterproofed without full drying?
Dry concrete is essential for the coating to work. If the pool leaks constantly, send photos and we will tell you whether the leak must be fixed first or if waterproofing can proceed.
Must existing tiles be removed before applying the cementitious coating?
Not always. If the tiles are well-bonded and sound, the surface can be cleaned and the coating applied around them. Photos help us assess the tiles' state and whether removal is needed.
What decides the cost of cementitious pool waterproofing?
The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Is Prince Muhammed Ibn Saud within your service area?
Yes, Prince Muhammed Ibn Saud is one of the areas we work in, as are Dammam, Madinat Al Ummal (near Dammam) and Al Adamah. To start, call us or message us on WhatsApp.
We also offer it in neighbouring areas
We also offer cementitious pool waterproofing in Dammam, Madinat Al Ummal (near Dammam) and Al Adamah, among the closest areas to Prince Muhammed Ibn Saud.
More services in Prince Muhammed Ibn Saud

