Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Nuayriyah

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Nuayriyah

Cementitious pool waterproofing in Nuayriyah begins with photos of the pool shell and tiles, sent by call or WhatsApp. The town is largely family houses on plots of mixed size, where a pool is often added to the courtyard, and the flexible cement coating seals the concrete and holds the tiles.

Nuayriyah is largely family houses on plots of varying size, and many pools were added later in courtyards. A pool built this way may show cracks where the wall meets the floor or gaps between tile lines. Because the walls and floor are often concrete poured on site, the coating goes on only once the surface is cleaned and cracks are opened and filled. The photos decide whether the coating alone will do or whether the damage must be repaired first.

  • Nuayriyah is a town in the Eastern Province, close to Al Muhammadiyah and Al Faisaliyah.
  • A pool added to a house later often needs the joint between floor and wall checked before coating.
What the service includes

What the service covers in Nuayriyah

  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Closing return pipe openings and drain outlets before the coating goes on
  • Treating hairline cracks and the wall-to-floor junction
  • Applying the flexible cementitious layer over the whole shell
How we work

How we carry out cementitious pool waterproofing in Nuayriyah

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

We serve Nuayriyah and around itIncluding Al Muhammadiyah (near Nuayriyah), Al Faisaliyah (near Nuayriyah) and Al Aziziyah (near Nuayriyah), as part of our work across the Eastern Province.

Nuayriyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Nuayriyah

Is a courtyard pool harder to coat than an open one?

Not necessarily, though access to the walls matters. Courtyard pools are usually easier to reach once furniture and planting are cleared, and the photos help us plan the work with you.

Can the tiles stay in place during the coating?

Sound tiles can often stay if they are firmly bonded and well cleaned. Loose tiles are removed and refixed before coating, and we will confirm from the photos which tiles need attention.

Does cementitious waterproofing work for both in-ground and above-ground pools?

Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.

How does cementitious waterproofing differ from other pool coatings?

Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

What should I send you from Nuayriyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Nuayriyah, and we will work out the next step with you.

Nearby areas

Areas near Nuayriyah

Nearby areas we also cover: Al Muhammadiyah (near Nuayriyah), Al Faisaliyah (near Nuayriyah) and Al Aziziyah (near Nuayriyah).

Other services in the area

More services in Nuayriyah

Empty seaside pool during waterproofing

We start with you in Nuayriyah
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp