
Cementitious pool waterproofing in Imhaish
Cementitious pool waterproofing in Imhaish starts with a photo sent via WhatsApp or call describing the pool location and leaks. The hamlet is small, containing villas and simple apartment buildings with most pools in private yards. Flexible cement lining protects concrete and tiles from moisture and ongoing leakage.
Imhaish is a small hamlet with pools in villa and apartment yards, suffering from intense summer heat and inland dryness. Concrete undergoes harsh shrinking and swelling cycles, showing cracks on floors and walls, especially at corners and joints. Tiles can loosen from weak joints and allow water leakage. Photos clarify tile condition, cracks and the cause of leakage, enabling us to choose the right lining for each pool.
- Imhaish is a hamlet in the Eastern Province near Halat Mahish, Al Jarudiyah and Az Zomorod Two.
- Tile in an old pool may be weak because underlying joints deteriorate from repeated heat and moisture.
The cementitious pool waterproofing work in Imhaish
- Cleaning the concrete surface and removing any adhesive residue or dust
- Applying the flexible cementitious layer over the whole shell
- Checking the pool walls and floor and locating cracks and openings
- Closing return pipe openings and drain outlets before the coating goes on
How we carry out cementitious pool waterproofing in Imhaish
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Cementitious pool waterproofing in ImhaishWe choose the method and the materials once we know the condition of the spot.
Start from Imhaish with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Imhaish
Can old tile be kept when waterproofing a pool in Imhaish?
If the tile is well bonded to the concrete, yes. But weak joints may need repair or replacement. Photos show whether the tile can stay or not.
Does cement lining stop water seeping from pool walls into the surrounding ground?
Yes, if concrete and joints are properly protected with lining. But if seepage comes from underground pipes, that is different. Photos and the call will clarify the actual leak source.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
What should I send you from Imhaish?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Imhaish, and we will work out the next step with you.
The same service in nearby areas
Nearby areas we also cover: Halat Mahish, Al Jarudiyah (near Imhaish) and Az Zomorod Two.
More services in Imhaish
