Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Ibn Sharar

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Ibn Sharar

Cementitious pool waterproofing in Ibn Sharar starts with WhatsApp photos showing the pool and its state. Private pools sit in house and villa yards throughout the village, where walls and floors face sun and moisture all year. The flexible cement coating protects the concrete and holds the tiles firm under water pressure and heat.

Pools in Ibn Sharar are typically open to the air and sun during the warm season. Concrete exposed to intense heat and constant water tends to crack around corners and joints, and tiles may peel where the base weakens. The flexible cement coating moves with the concrete's shrinkage and expansion, stopping water from entering the structure beneath. Photos show the location of visible cracks and leaks before treatment is chosen.

  • Ibn Sharar is a village in the Eastern Province, close to Al Hayra and Manakh, with houses and villas set on private plots.
  • An open village pool faces direct sunlight for many hours, which speeds the decay of old coating and tiles.
What the service includes

The main items of cementitious pool waterproofing in Ibn Sharar

  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Treating hairline cracks and the wall-to-floor junction
  • Wet curing after application so the coating sets correctly
  • Applying the flexible cementitious layer over the whole shell
How we work

This is how we work in Ibn Sharar

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Your request from Ibn Sharar comes to usCall or WhatsApp on one number, and we answer you ourselves.

Ibn Sharar is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on cementitious pool waterproofing in Ibn Sharar

Can an old pool in Ibn Sharar be repaired, or must it be drained completely?

It depends on the concrete and tile condition. Photos will show whether the existing coating can be repaired or must be renewed entirely. We may not need to drain the pool in every case, but the photos will decide.

Can the cement coating withstand Ibn Sharar's intense summer heat?

The flexible cement coating is designed to move with expansion and contraction from heat and cold. It resists cracking under thermal stress if properly applied to sound concrete.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Do you offer cementitious pool waterproofing in Ibn Sharar?

Yes. Ibn Sharar is within our service area in the Eastern Province, and we also work in Al Hayra, Manakh and Umm Qulayb. Call us or send photos of the spot on WhatsApp.

How does cementitious waterproofing differ from other pool coatings?

Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Nearby areas

Areas near Ibn Sharar

Nearby areas we also cover: Al Hayra, Manakh and Umm Qulayb.

Other services in the area

More services in Ibn Sharar

Empty seaside pool during waterproofing

Cementitious pool waterproofing in Ibn Sharar?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp