
Cementitious pool waterproofing in Ghunan
Cementitious pool waterproofing in Ghunan begins with a WhatsApp or phone call containing photos of the pool inside and out. The village has small and large pools of different ages, all needing flexible cement coating to protect concrete and tiles from leaks and cracking.
Ghunan pools face pressure from heat and humidity, especially those near the coast or in open areas. Older concrete may show fine cracks around corners and openings, and slow seepage may occur through tiles. A flexible cement coating fixes these cracks, seals the surface and bonds tiles together firmly. Preparation requires complete cleaning and repair of all cracks and joints before coating starts, and photos determine whether the base concrete is strong or needs extra treatment.
- Ghunan is a village in the Eastern Province, near the Second Industrial Area, West Al Aziziyah and Half Moon Beach, with multiple pools.
- Pools near the coast endure high salinity and humidity, and flexible coating provides long-term protection.
What we do for you in Ghunan
- Wet curing after application so the coating sets correctly
- Applying the flexible cementitious layer over the whole shell
- Cleaning the concrete surface and removing any adhesive residue or dust
- Closing return pipe openings and drain outlets before the coating goes on
The stages of the work in Ghunan
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Cementitious pool waterproofing in GhunanWe choose the method and the materials once we know the condition of the spot.
Ghunan is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book cementitious pool waterproofing in Ghunan
Can a pool near the coast in Ghunan be coated without worry about salt?
Flexible cement coating is designed to withstand moisture and salt. But the surface must be thoroughly cleaned of salts before coating. The photos will show the surface condition and we will tell you what is needed.
Does coating a new pool in Ghunan differ from an old one?
A new pool needs simpler cleaning and preparation. An old pool may need crack and joint repairs. The photos show your situation and the required steps.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Is Ghunan within your service area?
Yes, Ghunan is one of the areas we work in, as are second industrial (near Dhahran), West Al Aziziyah and Half Moon Beach. To start, call us or message us on WhatsApp.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
The same service in nearby areas
Nearby areas we also cover: second industrial (near Dhahran), West Al Aziziyah and Half Moon Beach.
More services in Ghunan

