Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Ayn Dar

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Ayn Dar

Cementitious pool waterproofing in Ayn Dar starts with a photo of the pool and its surroundings sent by phone or WhatsApp. The village has houses and villas with private pools, and cementitious coating protects the concrete walls and floor from water seeping through whilst holding the tiles in place.

Ayn Dar contains houses and villas with private pools of varying age and size. Older pools often show cracks in the concrete or seepage around tile joints, whilst newer ones may only need the existing coating refreshed. The region's intense heat stresses the exposed pool surface, and moisture can affect the durability of the tiles and substrate beneath. Photos determine the pool's actual condition before the treatment method is chosen.

  • Ayn Dar is a village in the Eastern Province, close to Ayn Dar al Qadimah and Al Kidadiyah, with houses and villas set among gardens and yards.
  • Private pools in villages are exposed to the sun year-round, so the cementitious coating must withstand both heat and water continuously.
What the service includes

What the service covers in Ayn Dar

  • Wet curing after application so the coating sets correctly
  • Checking the pool walls and floor and locating cracks and openings
  • Closing return pipe openings and drain outlets before the coating goes on
  • Cleaning the concrete surface and removing any adhesive residue or dust
How we work

This is how we work in Ayn Dar

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

Cementitious pool waterproofing in Ayn DarWe choose the method and the materials once we know the condition of the spot.

We serve Ayn Dar and around itIncluding Ayn Dar al Qadimah, Yakrub and Al Kidadiyah (near Ayn Dar), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ayn Dar

Can an old pool in Ayn Dar be waterproofed without emptying it completely?

The cementitious coating cannot be applied to a wet surface, so the pool must be emptied first and then cleaned and allowed to dry. Send photos of its current state so we can explain the steps to you clearly.

What is the difference between pool waterproofing and repairing damaged tiles?

Damaged tiles may indicate a deeper problem in the concrete or the layers below. Cementitious coating thoroughly treats the concrete and joints, then secures existing tiles in place. Photos will show whether the tiles need replacing or whether waterproofing alone is sufficient.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Do you cover Ayn Dar?

Yes. We serve Ayn Dar and nearby areas such as Ayn Dar al Qadimah, Yakrub and Al Kidadiyah (near Ayn Dar), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ayn Dar al Qadimah, Yakrub and Al Kidadiyah (near Ayn Dar).

Other services in the area

More services in Ayn Dar

Empty seaside pool during waterproofing

Cementitious pool waterproofing in Ayn Dar?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp