Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in At Tubi (near Qatif)

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in At Tubi (near Qatif)

Cementitious pool waterproofing in At Tubi starts with photos of the basin, its walls and its floor, sent by call or WhatsApp. Pools here are usually concrete-walled with tiles, and the flexible cement coating is applied to seal the concrete and hold the tiles in place.

At Tubi is a town made up mostly of detached villas and houses with gardens, where private pools are built after the main structure. Such basins often develop cracks at the floor corners and wall joints, and the tiles can loosen when the water level changes. A flexible cement coating can cover these joints without fully dismantling the basin, and the photos will show whether it suits your case.

  • At Tubi is a town in the Eastern Province, close to Al Madaris, Ash Shahba and Al Madani, made up mostly of detached villas and houses.
  • A flexible cement coating needs a clean, salt-free concrete surface before it is applied.
What the service includes

The cementitious pool waterproofing work in At Tubi (near Qatif)

  • Closing return pipe openings and drain outlets before the coating goes on
  • Checking the pool walls and floor and locating cracks and openings
  • Applying the flexible cementitious layer over the whole shell
  • Treating hairline cracks and the wall-to-floor junction
How we work

How we carry out cementitious pool waterproofing in At Tubi (near Qatif)

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

At Tubi (near Qatif) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Cementitious pool waterproofing in At Tubi (near Qatif)We choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in At Tubi (near Qatif)

Is cement coating suitable for a villa pool in At Tubi?

Often yes, provided the concrete is sound and can take the coating. If the cracks are wide or moving, the photos will show it and we will suggest what suits them.

Do you serve At Tubi and its surroundings?

Yes, we serve At Tubi. Send photos of the pool and tell us whether it is near Al Madaris or Ash Shahba so we can place it in the town.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Is At Tubi (near Qatif) within your service area?

Yes, At Tubi (near Qatif) is one of the areas we work in, as are At Tawbi (near Ad Doij), Al Madaris and Ash Shahba. To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also offer cementitious pool waterproofing in At Tawbi (near Ad Doij), Al Madaris and Ash Shahba, among the closest areas to At Tubi (near Qatif).

Other services in the area

More services in At Tubi (near Qatif)

Empty seaside pool during waterproofing

We start with you in At Tubi (near Qatif)
with one call

Describe the problem and where it is in At Tubi (near Qatif), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp