Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in At Tahliyah

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in At Tahliyah

Cementitious pool waterproofing in At Tahliyah starts with photos of the pool walls, floor and coping, sent by call or on WhatsApp. We serve At Tahliyah, where residential compounds and private villas both include pools, so we read the condition of each shell before choosing a coating.

At Tahliyah sits among residential compounds with shared pools and villas with private ones, so pools there differ in size, age and how heavily they are used. A shared pool may carry steady wear along its waterline, while a private one was often built later beside a house with its own garden. Such shells usually show hairline cracks and a weakened edge at the tile line. A flexible cement-based coating suits sound concrete, and the photos help show whether the surface is ready for it.

  • At Tahliyah is a district in the Eastern Province, lying close to Al Aziziyah, Al Buhayrah and Ishbiliya.
  • Pools in heavy daily use often show wear along the waterline, where the coating meets air and water.
What the service includes

The main items of cementitious pool waterproofing in At Tahliyah

  • Applying the flexible cementitious layer over the whole shell
  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Treating hairline cracks and the wall-to-floor junction
  • Wet curing after application so the coating sets correctly
How we work

The steps of cementitious pool waterproofing in At Tahliyah

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

At Tahliyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from At Tahliyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in At Tahliyah

Does a shared pool in At Tahliyah need its whole surface coated?

It depends on the photos. Where the concrete is sound, only the worn or cracked sections may need work, and we will show you which parts need attention before anything is applied.

Do you work inside residential compounds in At Tahliyah?

Yes, we serve At Tahliyah. Send photos of the pool and its surrounding deck, and mention whether it belongs to a compound or a private plot, so we can arrange the work with the right people.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

What should I send you from At Tahliyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in At Tahliyah, and we will work out the next step with you.

Does cementitious waterproofing work for both in-ground and above-ground pools?

Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.

Nearby areas

Areas near At Tahliyah

We also offer cementitious pool waterproofing in Al Aziziyah (near Al Khobar), Al Buhayrah (near Al Khobar) and Ishbiliya, among the closest areas to At Tahliyah.

Other services in the area

More services in At Tahliyah

Empty seaside pool during waterproofing

Tell us about your site in At Tahliyah
and we will plan the next step with you

Call us or send photos of the pool walls and floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp