
Cementitious pool waterproofing in As Sinaiyah (near An Nabiyah)
Cementitious pool waterproofing in As Sinaiyah begins with photos of the pool walls, floor and tile line, sent to us by call or on WhatsApp. The flexible coating bonds to the concrete and holds the tiles together, and the photos decide how much preparation the pool needs before work starts.
As Sinaiyah is a mixed district, with homes, small workshops and commercial buildings sitting close together. Pools are less common here than in purely residential districts, and where one exists it is usually on a larger private property or a yard attached to a building. Those yards are exposed to dust and direct sun, which can wear the coating surface over time. The photos show whether the surface needs recoating or the joints need repair.
- As Sinaiyah is a district in the Eastern Province, close to Ar Rabiyah, Al Fayha and Al Khalij.
- A pool in an open yard faces dust and sun, so its coating surface is worth regular inspection.
The scope of the work in As Sinaiyah (near An Nabiyah)
- Treating hairline cracks and the wall-to-floor junction
- Checking the pool walls and floor and locating cracks and openings
- Closing return pipe openings and drain outlets before the coating goes on
- Cleaning the concrete surface and removing any adhesive residue or dust
The steps of cementitious pool waterproofing in As Sinaiyah (near An Nabiyah)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
We serve As Sinaiyah (near An Nabiyah) and around itIncluding Ar Rabiyah (near Sayhat), Al Fayha (near Sayhat) and Al Khalij (near Sayhat), as part of our work across the Eastern Province.
Your request from As Sinaiyah (near An Nabiyah) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Before you book cementitious pool waterproofing in As Sinaiyah (near An Nabiyah)
Is a pool in a yard beside a workshop treated differently?
The coating method is the same, but we look at dust and debris on the surface in the photos. Those are cleaned away before any coating goes on, so the new layer bonds to the concrete itself.
Can drainage work be combined with the pool coating?
Where the photos show a drain or pipe connected to the pool that is leaking, that can be looked at alongside the coating. The plan is agreed after the photos are reviewed, not before.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Do you offer cementitious pool waterproofing in As Sinaiyah (near An Nabiyah)?
Yes. As Sinaiyah (near An Nabiyah) is within our service area in the Eastern Province, and we also work in Ar Rabiyah (near Sayhat), Al Fayha (near Sayhat) and Al Khalij (near Sayhat). Call us or send photos of the spot on WhatsApp.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
We also offer it in neighbouring areas
We also offer cementitious pool waterproofing in Ar Rabiyah (near Sayhat), Al Fayha (near Sayhat) and Al Khalij (near Sayhat), among the closest areas to As Sinaiyah (near An Nabiyah).
More services in As Sinaiyah (near An Nabiyah)

