Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in As Salam (near Dammam)

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in As Salam (near Dammam)

Cementitious pool waterproofing in As Salam begins with photos of the pool, tiles and grout sent by WhatsApp or call. The flexible cement coating seals the concrete and fixes tiles and grout against separation and leaks. Each case needs initial photo inspection to determine need and method.

As Salam contains houses and villas of various sizes, many with small or medium pools. Pools here may be old or new; older ones often show hairline cracks or paint flaking. Intense summer heat and seasonal moisture speed the wear of grout and tiles. The surface may hold dirt or algae from humidity, and thorough cleaning before coating is needed to ensure strong bonding.

  • As Salam is a district in the Eastern Province, near Ad Dawasir, Al Badi and Az Zuhur.
  • Tiles and grout loosen in residential areas where maintenance is light, and fresh cementitious coating rebinds them and protects concrete from moisture.
What the service includes

What we do for you in As Salam (near Dammam)

  • Treating hairline cracks and the wall-to-floor junction
  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Checking the pool walls and floor and locating cracks and openings
  • Applying the flexible cementitious layer over the whole shell
How we work

From first contact to the finished job in As Salam (near Dammam)

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

As Salam (near Dammam) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from As Salam (near Dammam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in As Salam (near Dammam)

Do algae on grout affect the new coating?

Yes, they must be cleaned first. Algae prevent bonding and may leave the new coating weak or loose. The photos show how bad it is and we clean the surface thoroughly before starting.

How long does the new coating take to become hard?

It depends on climate and moisture. The coating must dry fully before water enters. The initial call and photos will explain how long to wait before using the pool again.

Does cementitious waterproofing work for both in-ground and above-ground pools?

Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Do you offer cementitious pool waterproofing in As Salam (near Dammam)?

Yes. As Salam (near Dammam) is within our service area in the Eastern Province, and we also work in Ad Dawasir, Al Badi (near Dammam) and Az Zuhur (near Dammam). Call us or send photos of the spot on WhatsApp.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Ad Dawasir, Al Badi (near Dammam) and Az Zuhur (near Dammam).

Other services in the area

More services in As Salam (near Dammam)

Empty seaside pool during waterproofing

Your first step in As Salam (near Dammam):
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp