Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Ar Ruqi

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Ar Ruqi

Cementitious pool waterproofing in Ar Ruqi starts with photos of the pool and its condition sent by call or WhatsApp. Villages have family pools and communal swimming areas, where concrete floors and walls typically need protection from cracking and leaks.

Village pools are often simple structures with bare concrete exposed to sun and moisture year-round. Extreme summer heat and humidity cause expansion and contraction, showing fine cracks in the walls and floor, leading to water loss. Cementitious lining forms a flexible layer that tolerates this movement and shields the concrete from cracking. Photos show where cracks are and how severe they are before the protective coating thickness is chosen.

  • Ar Ruqi is a village in the Eastern Province, close to Abar ar Ruqi, Ar Rawdah and Al Fayha, with family pools and shared swimming areas.
  • Exposed concrete pools in villages undergo large daily temperature swings that cause slow cracking in the walls.
What the service includes

What we do for you in Ar Ruqi

  • Checking the pool walls and floor and locating cracks and openings
  • Applying the flexible cementitious layer over the whole shell
  • Wet curing after application so the coating sets correctly
  • Treating hairline cracks and the wall-to-floor junction
How we work

This is how we work in Ar Ruqi

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Your request from Ar Ruqi comes to usCall or WhatsApp on one number, and we answer you ourselves.

Cementitious pool waterproofing in Ar RuqiWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in Ar Ruqi

Can an old pool in Ar Ruqi be waterproofed or must it be rebuilt?

If the underlying concrete is sound and not severely fractured, it can be waterproofed with cementitious lining. Photos tell us whether the structure is worth coating or if the damage runs deeper.

Does cementitious lining withstand the intense heat in Ar Ruqi?

Yes, cementitious lining is designed for heat, moisture and concrete movement. It must be thick enough for your pool's condition, which the photos you send us will determine.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Do you cover Ar Ruqi?

Yes. We serve Ar Ruqi and nearby areas such as Abar ar Ruqi, Ar Rawdah (near Hafar Al-Batin) and Al Fayha (near Hafar Al-Batin), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Nearby areas

Cementitious pool waterproofing near Ar Ruqi

Nearby areas we also cover: Abar ar Ruqi, Ar Rawdah (near Hafar Al-Batin) and Al Fayha (near Hafar Al-Batin).

Other services in the area

More services in Ar Ruqi

Empty seaside pool during waterproofing

Your first step in Ar Ruqi:
a call or a WhatsApp message

Call us or send photos of the pool walls and floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp