Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Ar Rakah Al Janubiyah

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Ar Rakah Al Janubiyah

Cementitious pool waterproofing in Ar Rakah Al Janubiyah starts with photos of the basin, its walls and its floor, sent by call or WhatsApp. The district lies near Qurtubah, Sports City and Al Bahar, and its pools range from private villas to small basins.

Ar Rakah Al Janubiyah is made up of houses and villas of varying size, and a pool may sit close to an outer wall or in the middle of a wide yard. Pools in coastal areas can be weakened over time by salty humidity, with cracks usually appearing at corners and joints. Newer basins often need a flexible coating that accommodates tile movement. The photos show whether the condition is surface-level or needs deeper treatment.

  • Ar Rakah Al Janubiyah is a district in Al Khobar in the Eastern Province, close to Qurtubah, Sports City and Al Bahar.
  • Salty humidity near the sea weakens exposed cement surfaces, so basin corners and joints are usually inspected first.
What the service includes

What the service covers in Ar Rakah Al Janubiyah

  • Wet curing after application so the coating sets correctly
  • Closing return pipe openings and drain outlets before the coating goes on
  • Treating hairline cracks and the wall-to-floor junction
  • Checking the pool walls and floor and locating cracks and openings
How we work

The steps of cementitious pool waterproofing in Ar Rakah Al Janubiyah

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

Ar Rakah Al Janubiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Cementitious pool waterproofing in Ar Rakah Al JanubiyahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about cementitious pool waterproofing in Ar Rakah Al Janubiyah

Are pools in Ar Rakah Al Janubiyah affected by humidity from the sea?

They can be, since salty humidity weakens cement surfaces over time. The photos usually reveal cracks at corners and joints that need treatment.

Does the coating method depend on where the pool sits in Ar Rakah Al Janubiyah?

Yes, a pool close to an outer wall differs from one in the middle of a yard. We decide the method after reviewing the photos and the site conditions.

How do I request cementitious pool waterproofing in Ar Rakah Al Janubiyah?

Call us, or send clear photos of the spot and its location in Ar Rakah Al Janubiyah on WhatsApp, and we will work out the next step with you.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Nearby areas

The same service in nearby areas

We also offer cementitious pool waterproofing in Qurtubah (near Al Khobar), Sports City (near Al Khobar) and Al Bahar (near Al Khobar), among the closest areas to Ar Rakah Al Janubiyah.

Other services in the area

More services in Ar Rakah Al Janubiyah

Empty seaside pool during waterproofing

We start with you in Ar Rakah Al Janubiyah
with one call

Describe the problem and where it is in Ar Rakah Al Janubiyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp