Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Ar Rabiah

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Ar Rabiah

Cementitious pool waterproofing in Ar Rabiah begins with WhatsApp photos or a call. Ar Rabiah is a coastal district with villas and apartment blocks, and many homes contain private pools.

Pools in Ar Rabiah face coastal humidity and salt in the air, affecting both concrete and tile. Leaks usually appear round joints and corners, and damp may rise from the ground around the pool. Cement coating creates a protective layer on the concrete, blocks water and salt entry and binds tile firmly. Photos show where the leak is and how much damage there is, so we choose the right solution with you.

  • Ar Rabiah is a coastal district in the Eastern Province, close to Qatif, Badiah Al Basri and Al Qalah.
  • Coastal pools suffer tile erosion and salt deposit, so the lining must withstand both salinity and humidity.
What the service includes

What the service covers in Ar Rabiah

  • Treating hairline cracks and the wall-to-floor junction
  • Closing return pipe openings and drain outlets before the coating goes on
  • Applying the flexible cementitious layer over the whole shell
  • Checking the pool walls and floor and locating cracks and openings
How we work

How we carry out cementitious pool waterproofing in Ar Rabiah

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Your request from Ar Rabiah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Ar Rabiah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cementitious pool waterproofing in Ar Rabiah

Does air salt harm a pool in Ar Rabiah?

Yes, salt deposits on tile and concrete and causes erosion. Cement coating provides protection against both salt and moisture, extending the pool's life.

Can a pool in an apartment block be waterproofed?

Yes, we serve Ar Rabiah. Send photos of the pool and its surroundings. In shared buildings access may be limited, but we coordinate with you to choose the right time.

Do you cover Ar Rabiah?

Yes. We serve Ar Rabiah and nearby areas such as Qatif, Badiah Al Basri and Al Qalah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Nearby areas

Cementitious pool waterproofing near Ar Rabiah

Nearby areas we also cover: Qatif, Badiah Al Basri and Al Qalah.

Other services in the area

More services in Ar Rabiah

Empty seaside pool during waterproofing

In Ar Rabiah and need cementitious pool waterproofing?
Send us photos of the spot

Describe the problem and where it is in Ar Rabiah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp