
Cementitious pool waterproofing in Al Uyaynah
Cementitious pool waterproofing in Al Uyaynah starts with one or more pool photos sent via WhatsApp or call. The hamlet has simple houses and small villas, many with small private pools. The cement coating stops water and moisture from seeping beneath walls and floors.
Pools here are generally small and may have shallow foundations due to the land. The concrete may start cracking after years of use and exposure to heat and cold swings. Tiles and marble may lift if water enters between them and the concrete. Moisture from seeping water may damage house floors and furniture near the pool. The cement coating forms a strong barrier against moisture and protects the structure's integrity. Your photos from inside and outside the pool will show the degree of cracking and any other repairs needed.
- Al Uyaynah is a hamlet in the Eastern Province, near Al Qulayyib, Al Wannan and Rizhan, with a limited number of houses.
- Hairline cracks in small pool floors widen with repeated filling and draining cycles.
What the service covers in Al Uyaynah
- Cleaning the concrete surface and removing any adhesive residue or dust
- Wet curing after application so the coating sets correctly
- Treating hairline cracks and the wall-to-floor junction
- Closing return pipe openings and drain outlets before the coating goes on
The steps of cementitious pool waterproofing in Al Uyaynah
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
Start from Al Uyaynah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Al Uyaynah comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book cementitious pool waterproofing in Al Uyaynah
Do shallow foundations in Al Uyaynah's small pools need special treatment?
The cement coating works on all foundation types as long as the concrete is sound. If there is weakness in the foundation itself, your photos will show it and we will tell you before proceeding.
Can waterproofing be applied to a small pool in one day?
It depends on the pool size, number of cracks and extent of repairs needed. Your photos will tell us the expected timeframe before we start.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Is Al Uyaynah within your service area?
Yes, Al Uyaynah is one of the areas we work in, as are Al Qulayyib, Al Wannan and Rizhan. To start, call us or message us on WhatsApp.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Cementitious pool waterproofing near Al Uyaynah
If the site is outside Al Uyaynah, the same service is available in Al Qulayyib, Al Wannan and Rizhan.
More services in Al Uyaynah

