Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Al Matar (near An Nabiyah)

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Al Matar (near An Nabiyah)

We waterproof cement-based pools in Al Matar, Dammam, with a flexible cement coating on walls and floor to seal the concrete and protect the tile. It begins with photos of the pool, sent by call or WhatsApp.

Al Matar in Dammam has comparatively newer houses and villas, near Al Amanah and Ash Shrouk. Many of its villas were built with private pools; a newer pool may need protective lining before tiling, while an older one usually needs its joints and top layer repaired.

  • Al Matar is a residential district of Dammam in the Eastern Province, near Al Amanah and Ash Shrouk.
  • A newly built pool needs time to cure before its first filling, or the new coating may crack.
What the service includes

The main items of cementitious pool waterproofing in Al Matar (near An Nabiyah)

  • Applying the flexible cementitious layer over the whole shell
  • Closing return pipe openings and drain outlets before the coating goes on
  • Wet curing after application so the coating sets correctly
  • Cleaning the concrete surface and removing any adhesive residue or dust
How we work

This is how we work in Al Matar (near An Nabiyah)

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Al Matar (near An Nabiyah) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Matar (near An Nabiyah) and around itIncluding Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about cementitious pool waterproofing in Al Matar (near An Nabiyah)

Can a new pool in Al Matar be waterproofed before the tile goes on?

Yes, that is the best moment for it. We check the concrete first and then apply the flexible coating before tiling, so the protection sits beneath the tile rather than over it.

Do you treat a leaking older pool in Al Matar, Dammam?

Yes, we serve Al Matar in Dammam. Send photos of the leak and the damp around the pool, so we can determine whether the source is the walls, the floor or the joints.

Is Al Matar (near An Nabiyah) within your service area?

Yes, Al Matar (near An Nabiyah) is one of the areas we work in, as are Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan. To start, call us or message us on WhatsApp.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

How does cementitious waterproofing differ from other pool coatings?

Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Matar (near An Nabiyah), in Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan.

Other services in the area

More services in Al Matar (near An Nabiyah)

Empty seaside pool during waterproofing

Your first step in Al Matar (near An Nabiyah):
a call or a WhatsApp message

Describe the problem and where it is in Al Matar (near An Nabiyah), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp