Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Al Lisafah

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Al Lisafah

We waterproof concrete swimming pools in Al Lisafah with a flexible cement-based coating applied to the walls and floor. The work starts with photos of the pool sent by call or WhatsApp, and the coating seals the concrete and holds the tiles firmly together.

Al Lisafah is a village made up mostly of houses and villas with gardens, and pools there are often small and built within the walls. Leaks in these cases usually appear at tile joints, around drain fittings, and where the concrete has cracked near the corners. The photos show whether the cracks need treating before the coating goes on.

  • Al Lisafah is a village in the Eastern Province, lying close to Umm ash Shifallah, Al Qara' and Al Hayra.
  • Concrete pool walls move with temperature and water loading, so small cracks often open at corners and joints.
What the service includes

What the service covers in Al Lisafah

  • Treating hairline cracks and the wall-to-floor junction
  • Wet curing after application so the coating sets correctly
  • Applying the flexible cementitious layer over the whole shell
  • Closing return pipe openings and drain outlets before the coating goes on
How we work

The stages of the work in Al Lisafah

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Your request from Al Lisafah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Lisafah and around itIncluding Umm ash Shifallah, Al Qara' and Al Hayra, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Lisafah

Can the cement coating be applied over an existing tiled pool?

It depends on how well the tiles are bonded and whether the concrete beneath is sound, which the photos will show before any decision. If tiles are loosening, those areas will need removing first.

Do you waterproof small villa pools in Al Lisafah?

Yes, we serve Al Lisafah. Send photos of the pool from several angles and point out any leak you have noticed, so we can choose the right approach for its size and condition.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Is Al Lisafah within your service area?

Yes, Al Lisafah is one of the areas we work in, as are Umm ash Shifallah, Al Qara' and Al Hayra. To start, call us or message us on WhatsApp.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Lisafah, the same service is available in Umm ash Shifallah, Al Qara' and Al Hayra.

Other services in the area

More services in Al Lisafah

Empty seaside pool during waterproofing

In Al Lisafah and need cementitious pool waterproofing?
Send us photos of the spot

Call us or send photos of the pool walls and floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp