
Cementitious pool waterproofing in Al Khubrah
Cementitious pool waterproofing in Al Khubrah begins with photos of the pool and its surroundings, sent by call or WhatsApp. The hamlet is mostly farms and wide plots, so many pools stand apart from the house and are filled and emptied on a different rhythm.
Farms and wide plots mean a pool may stand some distance from the house, with its own pump room and a long pipe run. Pools on farms are often used in bursts, so they can be empty for long periods and then filled again, which tests the coating in a way a constant pool does not. Pipe entries and the drain outlet are the points most likely to show a leak, and the photos help us locate them. The method is chosen once the shell is seen.
- Al Khubrah is a hamlet in the Eastern Province, close to As Sarrar, Az Zughayn and Ghanwa.
- Pipe entries and drain outlets are where leaks most often appear in pools that are emptied and refilled.
What the service covers in Al Khubrah
- Treating hairline cracks and the wall-to-floor junction
- Wet curing after application so the coating sets correctly
- Applying the flexible cementitious layer over the whole shell
- Cleaning the concrete surface and removing any adhesive residue or dust
How we carry out cementitious pool waterproofing in Al Khubrah
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
We serve Al Khubrah and around itIncluding As Sarrar, Az Zughayn and Ghanwa, as part of our work across the Eastern Province.
Start from Al Khubrah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about cementitious pool waterproofing in Al Khubrah
Can a pool on a farm be coated if it is rarely used?
A pool that sits empty for long spells needs its surface checked before coating, since dried or cracked areas must be prepared first. The photos and a note on how the pool is used will tell us what the shell needs.
Which part of a farm pool usually leaks first?
Around the pipe entries, the skimmer and the drain outlet is usually where water first escapes, because these joints move and are cut into the shell. The photos let us see those points before any work is planned.
Do you cover Al Khubrah?
Yes. We serve Al Khubrah and nearby areas such as As Sarrar, Az Zughayn and Ghanwa, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
What decides the cost of cementitious pool waterproofing?
The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Areas near Al Khubrah
If the site is outside Al Khubrah, the same service is available in As Sarrar, Az Zughayn and Ghanwa.
More services in Al Khubrah
