Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Al Kabrit

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Al Kabrit

Cementitious pool waterproofing in Al Kabrit begins with photos of the pool walls, floor and tile edges, sent by call or WhatsApp. The village is made up of houses on separate plots, and the flexible cement coating seals the concrete and holds the tiles firmly in place.

Al Kabrit is a village of houses on separate plots, where a pool is usually a private feature set in a garden or yard. Pools of this kind are sometimes built by hand, so the thickness and finish of the shell can differ from one house to the next. A flexible cement coating needs a clean, sound base, so the photos will show whether the existing surface can take it. Where the shell is weak, repair is planned first and the coating follows once the surface is ready.

  • Al Kabrit is a village in the Eastern Province, close to An Nuqayrah.
  • A pool built by hand may have uneven thickness, so the shell is checked before the coating goes on.
What the service includes

The main items of cementitious pool waterproofing in Al Kabrit

  • Wet curing after application so the coating sets correctly
  • Closing return pipe openings and drain outlets before the coating goes on
  • Checking the pool walls and floor and locating cracks and openings
  • Cleaning the concrete surface and removing any adhesive residue or dust
How we work

From first contact to the finished job in Al Kabrit

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

Your request from Al Kabrit comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Kabrit is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on cementitious pool waterproofing in Al Kabrit

Is a village pool treated differently from a city pool?

The method is the same, but the starting surface often differs. Village pools are frequently built with varied finishes, so the photos help us see the shell and plan the preparation accordingly.

Do you serve homes in villages near An Nuqayrah?

Yes, we serve Al Kabrit. Send photos of the pool and its surroundings, and tell us where the pool sits in the garden so we can understand access before we continue the conversation.

Does cementitious waterproofing work for both in-ground and above-ground pools?

Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.

Do you cover Al Kabrit?

Yes. We serve Al Kabrit and nearby areas such as An Nuqayrah (near As Saffaniyah), An Nuqayrah (near As Saffaniyah) 2 and An Nuqayrah (near As Saffaniyah) 4, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Nearby areas

The same service in nearby areas

If the site is outside Al Kabrit, the same service is available in An Nuqayrah (near As Saffaniyah), An Nuqayrah (near As Saffaniyah) 2 and An Nuqayrah (near As Saffaniyah) 4.

Other services in the area

More services in Al Kabrit

Empty seaside pool during waterproofing

We start with you in Al Kabrit
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp