
Cementitious pool waterproofing in Al Jamiyin (near Tarout)
Cementitious pool waterproofing in Al Jamiyin starts with photos of the pool sent by call or WhatsApp. The flexible coating covers concrete and tiles and stops leaks. Al Jamiyin is a district with villas and apartment blocks with varied pools.
Al Jamiyin contains a mix of villas and apartment blocks, each with pools of different sizes and shapes. Private pools in villas are relatively small; shared pools in apartment buildings are larger and deeper and serve multiple units. Concrete, tiles and joints in all these pools face continuous water, water pressure and intense summer heat. The flexible cementitious coating provides a unified barrier that protects the concrete, maintains the tiles and prevents leaks through cracks and joints. Photos show the pool's age and the concrete and tile condition to determine what it needs.
- Al Jamiyin is a district in the Eastern Province, close to Al Muruj, Tarout and Al Nakhil, with villas and apartment blocks.
- Shared apartment pools face heavier use and faster water circulation, so they need strong protection against leaks.
What the service covers in Al Jamiyin (near Tarout)
- Treating hairline cracks and the wall-to-floor junction
- Applying the flexible cementitious layer over the whole shell
- Closing return pipe openings and drain outlets before the coating goes on
- Wet curing after application so the coating sets correctly
The steps of cementitious pool waterproofing in Al Jamiyin (near Tarout)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Start from Al Jamiyin (near Tarout) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Al Jamiyin (near Tarout) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Your questions on cementitious pool waterproofing in Al Jamiyin (near Tarout)
Can a shared pool in an apartment building be waterproofed without taking it out of use?
It depends on the pool's condition and the treatment method. Some repairs can be done with water in it, but a full cementitious coating requires the pool to be drained. Photos help us choose the fastest and most suitable method.
Is cementitious coating suitable for older pools in Al Jamiyin?
Usually yes, when the base concrete is sound. Cracks and weak joints are treated first then the flexible coating is applied. Photos show whether the concrete can be repaired or not.
What should I send you from Al Jamiyin (near Tarout)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jamiyin (near Tarout), and we will work out the next step with you.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Areas near Al Jamiyin (near Tarout)
If the site is outside Al Jamiyin (near Tarout), the same service is available in Al Muruj (near Tarout), Tarout and Al Nakhil (near Tarout).
More services in Al Jamiyin (near Tarout)
