
Cementitious pool waterproofing in Al Jamiah (near Dhahran)
Cementitious pool waterproofing in Al Jamiah begins with WhatsApp photos of the pool interior and exterior. The district has modern and older residential and commercial buildings, some with private or shared pools that may suffer from leakage.
Al Jamiah mixes multi-storey apartment buildings and commercial complexes, with pools of varying ages and sizes. Concrete in shared pools in older buildings may have been exposed to water for a long time, causing leakage in surrounding walls and foundations. The flexible cement coating covers cracks and bonds tiles strongly, reducing seepage and preserving the building. Photos help determine damage extent and the appropriate method.
- Al Jamiah is a district in Al-Ahsa in the Eastern Province, near Tihamah and Al Qusur, dominated by multi-storey residential and commercial buildings.
- Shared pools in apartment buildings face constant water pressure and water-level changes, increasing the likelihood of cracking and leakage.
What the service covers in Al Jamiah (near Dhahran)
- Checking the pool walls and floor and locating cracks and openings
- Cleaning the concrete surface and removing any adhesive residue or dust
- Wet curing after application so the coating sets correctly
- Applying the flexible cementitious layer over the whole shell
From first contact to the finished job in Al Jamiah (near Dhahran)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Al Jamiah (near Dhahran) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Cementitious pool waterproofing in Al Jamiah (near Dhahran)We choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Common questions on cementitious pool waterproofing in Al Jamiah (near Dhahran)
Can a shared pool leak be fixed without disrupting residents?
Yes, if the leak is minor in limited areas, work can be done gradually. Severe leakage may require draining the pool. Photos sent via WhatsApp clarify how serious the situation is.
Is cementitious pool waterproofing suitable for pools in residential complexes in Al Jamiah?
Yes, this waterproofing type suits shared pools in apartment buildings. It provides long-term protection for concrete and tiles, reducing leakage that might affect flats beneath the pool.
What should I send you from Al Jamiah (near Dhahran)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jamiah (near Dhahran), and we will work out the next step with you.
What decides the cost of cementitious pool waterproofing?
The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
We also offer it in neighbouring areas
Nearby areas we also cover: Tihamah, Ad Danah Ash Shamaliyah and Al Qusur.
More services in Al Jamiah (near Dhahran)

