
Cementitious pool waterproofing in Al Hazm (near Umm as Sahik)
Cementitious pool waterproofing in Al Hazm starts with photos of the pool floor and walls, sent by call or WhatsApp. The district holds houses and villas in spaced residential streets, and its pools need the concrete checked before a coating is chosen.
Al Hazm has comparatively large plots and detached houses, so its pools vary in age and construction. Older pools often show concrete cracks and wear around drain points, while newer ones may need only minor repair before lining. Coastal humidity keeps some walls damp, and the photos reveal the condition of each pool individually.
- Al Hazm is a district of Dammam in the Eastern Province, near Umm as Sahik, Al Budur and Al Khatrashiyah, with detached houses.
- Drain points on the pool floor wear over time, so they are checked before any flexible layer is laid.
The cementitious pool waterproofing work in Al Hazm (near Umm as Sahik)
- Closing return pipe openings and drain outlets before the coating goes on
- Treating hairline cracks and the wall-to-floor junction
- Wet curing after application so the coating sets correctly
- Cleaning the concrete surface and removing any adhesive residue or dust
From first contact to the finished job in Al Hazm (near Umm as Sahik)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
Cementitious pool waterproofing in Al Hazm (near Umm as Sahik)We choose the method and the materials once we know the condition of the spot.
Al Hazm (near Umm as Sahik) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about cementitious pool waterproofing in Al Hazm (near Umm as Sahik)
Does cementitious coating suit detached-house pools in Al Hazm?
Yes, if the concrete is sound. Send photos of the floor and walls and tell us the pool's age, and the photos will show whether a cementitious coating is the right choice for your case.
What is done about drain points in an Al Hazm pool?
These points are inspected and cleaned, and any gap around them is repaired before coating so water does not seep in from behind. The photos show whether additional repair is needed.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Do you offer cementitious pool waterproofing in Al Hazm (near Umm as Sahik)?
Yes. Al Hazm (near Umm as Sahik) is within our service area in the Eastern Province, and we also work in Umm as Sahik, Al Budur and Al Khatrashiyah. Call us or send photos of the spot on WhatsApp.
We also offer it in neighbouring areas
We also work near Al Hazm (near Umm as Sahik), in Umm as Sahik, Al Budur and Al Khatrashiyah.
More services in Al Hazm (near Umm as Sahik)

