Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Al Hada

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Al Hada

Cementitious pool waterproofing in Al Hada begins with a photo of the pool basin and its floor, sent by call or WhatsApp. The district lies near Al Khobar and Al Olaya, with homes and villas whose pools differ in age and size.

Al Hada includes villas whose pools see heavy use, and frequent cleaning and water movement gradually wear down the surface layer on the floor. Larger basins need more careful preparation to ensure the coating bonds across the whole floor. The photos show where the wear lies and how far it extends before any layer is applied.

  • Al Hada is a residential district of Al Khobar in the Eastern Province, lying near Al Khobar itself, Al Olaya and Al Andalus.
  • A pool floor takes more constant abrasion than its walls, so its surface is examined with particular care.
What the service includes

What we do for you in Al Hada

  • Treating hairline cracks and the wall-to-floor junction
  • Applying the flexible cementitious layer over the whole shell
  • Checking the pool walls and floor and locating cracks and openings
  • Wet curing after application so the coating sets correctly
How we work

This is how we work in Al Hada

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Al Hada is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Hada comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on cementitious pool waterproofing in Al Hada

Does cementitious pool coating wear down with daily use in Al Hada?

Friction and frequent cleaning affect the surface over time, which is normal for any pool in use. The photos show how far the wear goes and whether it calls for reapplication.

Do you work on larger basins in Al Hada?

Yes, we serve the district. Send photos of the whole pool with its approximate dimensions, and we will agree with you on an application method that suits its size.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

How do I request cementitious pool waterproofing in Al Hada?

Call us, or send clear photos of the spot and its location in Al Hada on WhatsApp, and we will work out the next step with you.

Nearby areas

Areas near Al Hada

If the site is outside Al Hada, the same service is available in Al Khobar, Al Andalus (near Al Khobar) and Al Olaya.

Other services in the area

More services in Al Hada

Empty seaside pool during waterproofing

Tell us about your site in Al Hada
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp