
Cementitious pool waterproofing in Al Faysaliyah (near Dammam)
Cementitious pool waterproofing in Al Faysaliyah begins with photos of the pool sent by WhatsApp or phone. The district has modern villas and houses on varying plots, with private pools needing protection from water leaks and cracks caused by temperature changes.
Pools in Al Faysaliyah face large temperature swings between seasons and direct sun exposure. The underlying concrete may show hairline or wider cracks, especially at corners and openings. The flexible cementitious coating fills these gaps and protects the concrete from water absorption. Tiles fixed to the walls stay bonded when there is a tight seal between the concrete and water. Inspection by photos will show whether the concrete is sound or needs basic repair.
- Al Faysaliyah is a district in the Eastern Province, near Ar Rawdah, An Nada and Al Qadisiyah, with modern villas on spacious plots.
- Seasonal temperature swings cause repeated expansion and contraction in pool walls, creating new cracks as time passes.
The scope of the work in Al Faysaliyah (near Dammam)
- Applying the flexible cementitious layer over the whole shell
- Checking the pool walls and floor and locating cracks and openings
- Treating hairline cracks and the wall-to-floor junction
- Wet curing after application so the coating sets correctly
From first contact to the finished job in Al Faysaliyah (near Dammam)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
Cementitious pool waterproofing in Al Faysaliyah (near Dammam)We choose the method and the materials once we know the condition of the spot.
Al Faysaliyah (near Dammam) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on cementitious pool waterproofing in Al Faysaliyah (near Dammam)
Does cementitious coating protect tiles from coming loose in a pool in Al Faysaliyah?
Yes, the coating creates a strong bond between tiles and concrete. However, this depends on the concrete being sound and free from large cracks. The photos will show the actual condition.
Does waterproofing a new pool in Al Faysaliyah need the same steps as an old one?
No, a new pool may have concrete less prone to large cracks. However, proper preparation and even coating matter in both cases. The photos show what each case needs.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Is Al Faysaliyah (near Dammam) within your service area?
Yes, Al Faysaliyah (near Dammam) is one of the areas we work in, as are Ar Rawdah (near Dammam), An Nada and Al Qadisiyah. To start, call us or message us on WhatsApp.
The same service in nearby areas
Nearby areas we also cover: Ar Rawdah (near Dammam), An Nada and Al Qadisiyah.
More services in Al Faysaliyah (near Dammam)

