
Cementitious pool waterproofing in Al Fayha (near Al Awjam)
Cementitious pool waterproofing in Al Fayha starts with a photo of the pool and its condition, sent by call or WhatsApp. The district has villas and apartment blocks, many with private or shared pools, and the cement coating protects the concrete and holds the tiles in place.
Pools in Al Fayha vary widely: some are older, some newer, and concrete and tile conditions differ from one to another. An older pool may show small cracks at the corners and floor, or tiles may have come loose, while a newer one may only need its coating renewed after a few years. Strong summer heat stresses the exposed pool surface, warm water accelerates wear, and moisture can weaken the joints. Photos show whether the current coating is sound or needs repair or a full recoating.
- Al Fayha is a district in Al-Ahsa in the Eastern Province, close to Ar Rawabi, An Nahdah and At Talal, with numerous villas and apartment blocks.
- Concrete exposed to sun and warm water needs a coating strong enough to handle both heat and moisture.
The main items of cementitious pool waterproofing in Al Fayha (near Al Awjam)
- Applying the flexible cementitious layer over the whole shell
- Checking the pool walls and floor and locating cracks and openings
- Cleaning the concrete surface and removing any adhesive residue or dust
- Closing return pipe openings and drain outlets before the coating goes on
How we carry out cementitious pool waterproofing in Al Fayha (near Al Awjam)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Your request from Al Fayha (near Al Awjam) comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Al Fayha (near Al Awjam) and around itIncluding Ar Rawabi (near Al Awjam), An Nahdah (near Al Awjam) and At Talal (near Al Awjam), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on cementitious pool waterproofing in Al Fayha (near Al Awjam)
Can a pool be recoated while it still holds water?
No, the pool must be drained first, then the concrete and tiles are cleaned thoroughly. Photos will show the surface condition and whether repairs are needed before the new coating.
How long does cementitious pool coating last in Al Fayha?
It depends on water quality, usage and maintenance. A heavily used pool with warm water wears faster than a less-used one, so the coating should be checked regularly.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Is Al Fayha (near Al Awjam) within your service area?
Yes, Al Fayha (near Al Awjam) is one of the areas we work in, as are Ar Rawabi (near Al Awjam), An Nahdah (near Al Awjam) and At Talal (near Al Awjam). To start, call us or message us on WhatsApp.
We also offer it in neighbouring areas
We also work near Al Fayha (near Al Awjam), in Ar Rawabi (near Al Awjam), An Nahdah (near Al Awjam) and At Talal (near Al Awjam).
More services in Al Fayha (near Al Awjam)

