
Cementitious pool waterproofing in Al Badi (near Al Awjam)
Cementitious pool waterproofing in Al Badi starts with photos of the basin, walls and floor, sent by call or WhatsApp. A flexible cement-based coating seals the concrete and fixes the tiles in place, and the photos show whether the basin needs lining or crack repair first.
Al Badi is a residential district where villas and extended homes sit on mid-sized plots, and pools are common in front or back yards. These open basins face long summer heat, so tile edges expand and corners and joints crack over time. The photos show where the damage is before any method is chosen.
- Al Badi is a district in the Al-Ahsa governorate of the Eastern Province, lying close to Al Badiah and Al Awjam.
- An open basin in a front yard takes sun from several directions, so tiles expand unevenly and the flexible coating must allow for it.
The scope of the work in Al Badi (near Al Awjam)
- Closing return pipe openings and drain outlets before the coating goes on
- Applying the flexible cementitious layer over the whole shell
- Checking the pool walls and floor and locating cracks and openings
- Wet curing after application so the coating sets correctly
From first contact to the finished job in Al Badi (near Al Awjam)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Your request from Al Badi (near Al Awjam) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Al Badi (near Al Awjam) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about cementitious pool waterproofing in Al Badi (near Al Awjam)
Is a flexible coating suitable for an open pool in a yard in Al Badi?
Yes, the flexible coating is designed to handle the movement of an open basin as temperatures change. Send photos of the pool so we can confirm the floor and walls are ready for lining.
Do you treat cracked tiles in pools in Al Badi?
We address the causes of cracking, such as joint movement and moisture behind the tiles. Send photos of the cracked areas so we can decide whether reattaching is enough or the basin needs lining.
Do you cover Al Badi (near Al Awjam)?
Yes. We serve Al Badi (near Al Awjam) and nearby areas such as Al Badiah, Al Awjam and Al Aujam, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
More services in Al Badi (near Al Awjam)

