
Cementitious pool waterproofing in Al Awwamiyah
Cementitious pool waterproofing in Al Awwamiyah begins with photos of the pool sent by call or WhatsApp. The town has villas with private pools, where leaks appear from cracks and joints caused by heat and moisture.
Villas and residential buildings spread across Al Awwamiyah, many with private concrete pools. Silent leaks from hairline cracks and weak joints keep the pool floor damp and may weaken the concrete over time. The flexible cement coating bonds to the concrete surface, seals cracks and joints, and holds the tiles in place to stop leaks. But the coating's success depends on cleaning the surface and treating cracks before application. Photos show the level of cracking, damp and whether the concrete is ready.
- Al Awwamiyah is a town in the Eastern Province, close to An Narjis, Al Jumaimah and Az Zarah, with villas and residential buildings.
- Private villas often have older pools, and concrete cracking usually shows first at the joints and around fixtures.
What the service covers in Al Awwamiyah
- Checking the pool walls and floor and locating cracks and openings
- Applying the flexible cementitious layer over the whole shell
- Closing return pipe openings and drain outlets before the coating goes on
- Cleaning the concrete surface and removing any adhesive residue or dust
The steps of cementitious pool waterproofing in Al Awwamiyah
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Your request from Al Awwamiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Cementitious pool waterproofing in Al AwwamiyahWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on cementitious pool waterproofing in Al Awwamiyah
Can a private pool leak in Al Awwamiyah be fixed by coating alone?
If the leak is from small cracks or weak joints, the coating will fix it. But if it is from large cracks or structural damage, the photos will show that and we may need extra steps.
How long does cementitious coating application take on a pool in Al Awwamiyah?
It depends on the pool's size and the surface's condition. Cleaning and initial treatment may take time, and the coating itself needs time to bond fully. Initial photos help us give more accurate expectations.
Is Al Awwamiyah within your service area?
Yes, Al Awwamiyah is one of the areas we work in, as are An Narjis, Al Jumaimah and Az Zarah. To start, call us or message us on WhatsApp.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
The same service in nearby areas
We also work near Al Awwamiyah, in An Narjis, Al Jumaimah and Az Zarah.
More services in Al Awwamiyah

