
Cementitious pool waterproofing in Al Anwar (near Mallahah)
Cementitious pool waterproofing in Al Anwar begins with a WhatsApp message showing photos of the pool, where it is, and any cracks visible. The district has many villas and homes with private pools, and these pool floors and walls face constant shifts from water and heat.
Pools in Al Anwar vary in size and age; older ones may suffer cracks on the floor and walls, while newer ones may only need a fresh coating. The flexible cement coating seals fine concrete cracks and stops water leaking through, and it also holds marble or tile fixed to the walls. Long exposure to sun and water causes gradual cracking, and coastal humidity can affect the areas around the pool. Photos alone show the extent of damage and the right treatment.
- Al Anwar is a district in the Eastern Province, close to Al Aqiq, Mallahah and Halat Mahish, with many houses and villas.
- Private pools in residential districts face heavy daily use, which accelerates cracking and wear.
The main items of cementitious pool waterproofing in Al Anwar (near Mallahah)
- Checking the pool walls and floor and locating cracks and openings
- Closing return pipe openings and drain outlets before the coating goes on
- Applying the flexible cementitious layer over the whole shell
- Cleaning the concrete surface and removing any adhesive residue or dust
From first contact to the finished job in Al Anwar (near Mallahah)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
We serve Al Anwar (near Mallahah) and around itIncluding Al Aqiq (near Inak), Mallahah and Halat Mahish, as part of our work across the Eastern Province.
Cementitious pool waterproofing in Al Anwar (near Mallahah)We choose the method and the materials once we know the condition of the spot.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on cementitious pool waterproofing in Al Anwar (near Mallahah)
Does cement coating protect the marble on a pool wall in Al Anwar?
Yes, the coating seals between marble and concrete and stops water seeping behind it, keeping it fixed and protecting it from water and heat damage.
What causes cracks in Al Anwar pools to form faster?
Very high summer temperatures and the constant expansion and contraction of concrete, plus continuous water pressure and heavy use, are the main causes. Photos show which of these factors affect your pool.
How does cementitious waterproofing differ from other pool coatings?
Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
How do I request cementitious pool waterproofing in Al Anwar (near Mallahah)?
Call us, or send clear photos of the spot and its location in Al Anwar (near Mallahah) on WhatsApp, and we will work out the next step with you.
Cementitious pool waterproofing near Al Anwar (near Mallahah)
We also offer cementitious pool waterproofing in Al Aqiq (near Inak), Mallahah and Halat Mahish, among the closest areas to Al Anwar (near Mallahah).
More services in Al Anwar (near Mallahah)
