Abraj Al AzlContracting
Call العربية
Empty seaside pool during waterproofing

Pool waterproofing in Badr

Water stays in the pool

Waterproofing for concrete pool shells from the inside, before and after tiling

+966 54 311 2066
The service in your area

Pool waterproofing in Badr

Pool waterproofing in Badr begins with photos of the concrete shell sent to us by call or WhatsApp. The district has many villas and family homes, many with private pools in their courtyards.

Pools in Badr face intense heat and direct sun for long hours, causing cracks and wear at the floor, corners and joints. Some new shells need basic waterproofing before tiling, others are old with linings damaged by both heat and water. Treating cracks and weak points comes before applying new waterproofing, and the method varies with crack depth and the number of affected joints. Photos show us exactly what needs treatment.

  • Badr is a district in the Eastern Province near Ohod, An Noor and Al Manar, with villas and family homes.
  • Warm water in an open pool accelerates breakdown of old waterproofing materials, especially at joints.
What the service includes

The pool waterproofing work in Badr

  • Closing the waterproofing around the skimmer, drains and light fittings
  • Working before or after tiling depending on the condition of the pool
  • Leaving the layer to cure before refilling or tiling
  • Checking the shell walls, floor and corners
How we work

How we carry out pool waterproofing in Badr

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.

2

Inspect the shell and locate the points

The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.

3

Prepare the surface and treat the cracks

The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.

4

Apply the layer and let it cure

The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.

What sets us apart

Why Abraj Al Azl?

Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.

We serve Badr and around itIncluding Ohod, An Noor (near Ohod) and Al Manar (near Dammam), as part of our work across the Eastern Province.

Badr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Two workers in high-visibility vests insulating a roof beside the AC units
Round water tank lined in blue inside, with a float in the middle

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing in Badr

When should a pool's waterproofing be renewed in Badr?

Signs that renewal is needed include slow seepage, dampness appearing around the pool, or tile discoloration. Send photos of your pool's current condition so we can help you assess whether renewal is required.

Does new waterproofing stop all types of seepage in an old pool?

That depends on the condition of the concrete beneath. If the concrete is sound, new waterproofing offers strong protection; if there is deep damage, additional treatment may be needed. Photos and inspection clarify what protection is possible.

How do I know the pool is losing water through a leak and not evaporation?

Close the pool and stop the filtration system for a period and mark the water level. If the level falls more than the heat and the wind can explain, there is a leak. You can also check whether the soil around the pool stays wet. Send us photos and a description of what you notice on WhatsApp and we will help you read it.

Do you offer pool waterproofing in Badr?

Yes. Badr is within our service area in the Eastern Province, and we also work in Ohod, An Noor (near Ohod) and Al Manar (near Dammam). Call us or send photos of the spot on WhatsApp.

What decides the cost of waterproofing a pool?

The area of the shell and the size of the pool, the condition of the concrete and how many cracks there are, whether the work is before or after tiling, the material that suits the case, and how easily the site can be reached. Send photos of the pool and rough dimensions on WhatsApp and we will suggest the right treatment.

Does the pool have to be emptied before the work starts?

In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.

Nearby areas

The same service in nearby areas

We also work near Badr, in Ohod, An Noor (near Ohod) and Al Manar (near Dammam).

Other services in the area

More services in Badr

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Badr
and we will plan the next step with you

Call us or send photos of the pool and the points you suspect on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp