Abraj Al AzlContracting
Call العربية
Empty seaside pool during waterproofing

Pool waterproofing in Ashuhada

Water stays in the pool

Waterproofing for concrete pool shells from the inside, before and after tiling

+966 54 311 2066
The service in your area

Pool waterproofing in Ashuhada

Pool waterproofing in Ashuhada begins with a WhatsApp message containing clear photos of the concrete shell and its surroundings. The district has varied residential buildings and villas, many with shared or private pools prone to dampness and leaks.

Pools in Ashuhada serve families and residents of buildings and villas, varying in size, age and design. A concrete shell that stays full of water through the season faces constant pressure and intense heat. Fine cracks may not show at first but allow slow seeping around joints and corners. Damp under tiles or around the pool base is a clear sign of leaking. Inside waterproofing before or after tiling provides necessary protection. Photos clarify the problem and help choose the solution.

  • Ashuhada is a district in the Eastern Province near Al Khalij, Ar Rabie and Ar Rawabi, with varied residential buildings and villas.
  • Pools filled with saline or hot water experience faster deterioration of concrete and metal elements.
What the service includes

The scope of the work in Ashuhada

  • Checking the shell walls, floor and corners
  • Working before or after tiling depending on the condition of the pool
  • Treating cracks, joints and fitting openings
  • Applying the layer that suits the condition of the surface
How we work

The steps of pool waterproofing in Ashuhada

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.

2

Inspect the shell and locate the points

The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.

3

Prepare the surface and treat the cracks

The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.

4

Apply the layer and let it cure

The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.

What sets us apart

Why Abraj Al Azl?

Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.

Ashuhada is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Pool waterproofing in AshuhadaWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Two workers in high-visibility vests insulating a roof beside the AC units
Round water tank lined in blue inside, with a float in the middle

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing in Ashuhada

Why is there damp around the pool base even though no hole is visible?

The leak may come from hairline cracks invisible to the naked eye, or from joints between concrete and pipes. Detailed photos from inside help locate the source. Proper waterproofing stops the leak and prevents it from worsening.

Can the pool be used while it is being waterproofed?

No, the pool must be drained before starting so the team can work on the entire interior shell. Once waterproofing is complete and properly set, the pool can be refilled.

What materials are used for pool internal waterproofing?

Common materials include flexible cementitious coating that holds up under permanent moisture, liquid membrane that forms in place and covers corners and fittings easily, and crack injection materials. The choice depends on the condition of the shell and whether the work is before or after tiling.

Does the pool have to be emptied before the work starts?

In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.

How do I know the pool is losing water through a leak and not evaporation?

Close the pool and stop the filtration system for a period and mark the water level. If the level falls more than the heat and the wind can explain, there is a leak. You can also check whether the soil around the pool stays wet. Send us photos and a description of what you notice on WhatsApp and we will help you read it.

What should I send you from Ashuhada?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ashuhada, and we will work out the next step with you.

Nearby areas

Pool waterproofing near Ashuhada

We also work near Ashuhada, in Al Khalij (near Nuayriyah), Ar Rabie (near Nuayriyah) and Ar Rawabi (near Nuayriyah).

Other services in the area

More services in Ashuhada

Worker applying the white insulation layer on a villa roof by the sea

In Ashuhada and need pool waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp