Abraj Al AzlContracting
Call العربية
Empty seaside pool during waterproofing

Pool waterproofing in Ash Shahba

Water stays in the pool

Waterproofing for concrete pool shells from the inside, before and after tiling

+966 54 311 2066
The service in your area

Pool waterproofing in Ash Shahba

Pool waterproofing in Ash Shahba begins with a photo or video sent by call or WhatsApp. Ash Shahba is a residential district with villas and small apartment blocks, many of whose owners have private pools needing tight waterproofing against seepage and damp.

Pools in Ash Shahba face sharp seasonal climate swings; concrete expands and contracts, creating cracks around joints and corners. Surrounding moisture may increase water seepage through pool walls into the soil. Clear photos show cracks, colour shifts and damp marks, helping us choose a durable waterproofing method. An old pool may need tile removal first; a new one may need base waterproofing before tiling.

  • Ash Shahba is a residential district in the Eastern Province, near At Tubi and Al Qudayh.
  • Joints between a pool floor and walls are common weak points where water easily enters.
What the service includes

What we do for you in Ash Shahba

  • Leaving the layer to cure before refilling or tiling
  • Checking the shell walls, floor and corners
  • Applying the layer that suits the condition of the surface
  • Working before or after tiling depending on the condition of the pool
How we work

The stages of the work in Ash Shahba

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.

2

Inspect the shell and locate the points

The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.

3

Prepare the surface and treat the cracks

The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.

4

Apply the layer and let it cure

The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.

What sets us apart

Why Abraj Al Azl?

Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.

Pool waterproofing in Ash ShahbaWe choose the method and the materials once we know the condition of the spot.

Ash Shahba is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Two workers in high-visibility vests insulating a roof beside the AC units
Round water tank lined in blue inside, with a float in the middle

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing in Ash Shahba

Can a new pool in Ash Shahba be waterproofed before tiling?

Yes, we prefer this. Waterproofing before tiling protects the concrete better. Send photos of the raw concrete and joints, and we will choose the right waterproofing type based on pool depth and climate.

How do we know the pool needs new waterproofing in Ash Shahba?

If water seeps below the pool or into the surrounding soil, or if the floor stays damp, or if damp patches appear on outer walls, send photos and we will assess it. Fine cracks without obvious leaks may need monitoring.

Do you offer pool waterproofing in Ash Shahba?

Yes. Ash Shahba is within our service area in the Eastern Province, and we also work in At Tubi (near Qatif), Al Qudayh (near Qatif) and Al Qadih (near Al Awwamiyah). Call us or send photos of the spot on WhatsApp.

Can a tiled pool be waterproofed without lifting the tiles?

In some cases yes, if the leak is limited to the joints or around a specific fitting. But if the concrete shell beneath the tiles is the source, lifting the tiles in certain areas may be needed. Photos and inspection decide that; there is no single answer that fits every pool.

Does the pool have to be emptied before the work starts?

In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.

Which points in a pool shell leak most often?

The corners between the walls and the floor, the tile joints, the openings around the light fittings, the return fittings and the drains, and the skimmer connection. These points move more than the middle of the wall and open up under the water pressure and the changes in temperature.

Nearby areas

Areas near Ash Shahba

We also work near Ash Shahba, in At Tubi (near Qatif), Al Qudayh (near Qatif) and Al Qadih (near Al Awwamiyah).

Other services in the area

More services in Ash Shahba

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Ash Shahba
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp