
Pool waterproofing in As Saif
Pool waterproofing in As Saif starts with photos of the concrete structure and surroundings, sent by call or WhatsApp. Waterproofing protects walls and floors from inside before and after tiling, preventing seepage and preserving concrete integrity long term.
As Saif has modern houses, villas and apartment buildings with private pools and some compounds with swimming facilities. Concrete pools face daily heat swings, especially on exposed surfaces and walls, causing expansion and contraction that stresses the concrete. Older basins may show cracks in the floor or at corners, newer ones may only need their protective layer updated. Tiles and joints can become water paths if untreated. Clear photos help us understand the condition and choose the right method.
- As Saif is a district in the Eastern Province, near King Faisal University, As Sadafah and Al Fanar, with modern houses and apartment buildings.
- Pools in modern residential areas need regular waterproofing maintenance, as heavy use increases wear on protective layers.
The pool waterproofing work in As Saif
- Applying the layer that suits the condition of the surface
- Closing the waterproofing around the skimmer, drains and light fittings
- Leaving the layer to cure before refilling or tiling
- Working before or after tiling depending on the condition of the pool
This is how we work in As Saif
Send photos of the pool
On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.
Inspect the shell and locate the points
The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.
Prepare the surface and treat the cracks
The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.
Apply the layer and let it cure
The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.
Why Abraj Al Azl?
Protection for the concrete shellWater that seeps through the shell eventually reaches the reinforcement and weakens it. Closing the shell from the inside cuts off that path.
Your request from As Saif comes to usCall or WhatsApp on one number, and we answer you ourselves.
Pool waterproofing in As SaifWe choose the method and the materials once we know the condition of the spot.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Common questions on pool waterproofing in As Saif
Is waterproofing a new pool in As Saif different from waterproofing an old one?
Yes. A new pool may not have been waterproofed at all, so we apply initial waterproofing to dry concrete before tiling. An old one may need some tiles removed and cracks repaired first. Photos show the difference and determine the right plan.
Can you fix water leakage from an existing pool in As Saif without redoing everything?
It may be possible, depending on where and how much it leaks. If the leak is in one area, we may treat only that area without waterproofing the whole pool. Send us photos showing where it leaks so we can decide together.
How do I request pool waterproofing in As Saif?
Call us, or send clear photos of the spot and its location in As Saif on WhatsApp, and we will work out the next step with you.
Does the pool have to be emptied before the work starts?
In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.
How do I know the pool is losing water through a leak and not evaporation?
Close the pool and stop the filtration system for a period and mark the water level. If the level falls more than the heat and the wind can explain, there is a leak. You can also check whether the soil around the pool stays wet. Send us photos and a description of what you notice on WhatsApp and we will help you read it.
What decides the cost of waterproofing a pool?
The area of the shell and the size of the pool, the condition of the concrete and how many cracks there are, whether the work is before or after tiling, the material that suits the case, and how easily the site can be reached. Send photos of the pool and rough dimensions on WhatsApp and we will suggest the right treatment.
We also offer it in neighbouring areas
If the site is outside As Saif, the same service is available in King Faisal University, As Sadafah (near Al Khobar) and Al Fanar.
More services in As Saif

