
Pool waterproofing in Al Muruj (near Qaryah al Ulya)
Pool waterproofing in this part of Al Muruj starts with photos sent by call or WhatsApp. The area sits near surrounding villages, and the treatment depends on the pool's age and shape.
This part of Al Muruj has houses with large gardens and pools that may have been built many years ago, so the shells differ in shape and depth. Older shells sometimes show cracking linked to ground movement around the structure, which must be checked before waterproofing. Newer pools usually need only the joints and fittings reviewed. The photos show whether the case needs structural repair or surface treatment.
- This part of Al Muruj is a residential district in Al-Ahsa in the Eastern Province, lying close to Qaryah al Ulya, Az Zuhur and Ar Rawdah.
- Pools set in gardens can be affected by ground movement, so the structure is checked before any surface treatment.
The main items of pool waterproofing in Al Muruj (near Qaryah al Ulya)
- Checking the shell walls, floor and corners
- Closing the waterproofing around the skimmer, drains and light fittings
- Treating cracks, joints and fitting openings
- Working before or after tiling depending on the condition of the pool
This is how we work in Al Muruj (near Qaryah al Ulya)
Send photos of the pool
On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.
Inspect the shell and locate the points
The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.
Prepare the surface and treat the cracks
The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.
Apply the layer and let it cure
The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.
Why Abraj Al Azl?
Protection for the concrete shellWater that seeps through the shell eventually reaches the reinforcement and weakens it. Closing the shell from the inside cuts off that path.
Your request from Al Muruj (near Qaryah al Ulya) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from Al Muruj (near Qaryah al Ulya) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing in Al Muruj (near Qaryah al Ulya)
Do you treat an old garden pool with cracks in this part of Al Muruj?
Yes, once the cracks are examined to see whether they are surface or run through the structure. We send the findings from the photos before any work begins.
Are photos alone enough to plan pool waterproofing here?
Photos reveal much about the general condition, cracks and fittings, but some points only become clear on inspection. We will tell you what the photos show and what needs confirming.
What decides the cost of waterproofing a pool?
The area of the shell and the size of the pool, the condition of the concrete and how many cracks there are, whether the work is before or after tiling, the material that suits the case, and how easily the site can be reached. Send photos of the pool and rough dimensions on WhatsApp and we will suggest the right treatment.
Does the waterproofing method change with the shape and depth of the pool?
Yes. Pools with many corners or irregular shapes need more care at the bends because stresses concentrate there. The depth also affects the pressure the waterproof layer must carry. A liquid membrane forms easily at these points, while a cementitious coating needs careful preparation at the corners. Photos help us decide the right treatment for each shape.
Does the pool have to be emptied before the work starts?
In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.
Do you offer pool waterproofing in Al Muruj (near Qaryah al Ulya)?
Yes. Al Muruj (near Qaryah al Ulya) is within our service area in the Eastern Province, and we also work in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya). Call us or send photos of the spot on WhatsApp.
We also offer it in neighbouring areas
We also work near Al Muruj (near Qaryah al Ulya), in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya).
More services in Al Muruj (near Qaryah al Ulya)


