Abraj Al AzlContracting
Call العربية
Indoor mosaic-tiled pool

Pool renovation in Warehouse Area

The pool deserves a fresh start

Full renovation of ageing pools: stripping damaged tiles or plaster, treating cracks, re-waterproofing and refinishing

+966 54 311 2066
The service in your area

Pool renovation in Warehouse Area

Pool renovation in the Warehouse Area starts with WhatsApp photos showing the pool and visible damage. The district contains varied industrial and commercial buildings that may house employee pools or recreational facilities, where tile and grout often crack from continuous use and sun exposure.

Pools in the industrial and commercial area endure heavy use and sharp daily temperature swings. Cracked tile and crumbling grout allow water to seep into the substrate, and fine cracks in the pool walls can widen over time. Removing old tile and grout and repairing concrete cracks come before new waterproofing and finishing. Photos reveal the extent of damage and help us define the scope of work.

  • Warehouse Area is a district in the Eastern Province, close to Al Majidiyah, Al Aqiq and Ash Shweikah, with industrial and commercial buildings.
  • An exposed pool faces intense heat, accelerating tile and grout damage and widening cracks.
What the service includes

The pool renovation work in Warehouse Area

  • Sealing the waterproofing at drain openings and water returns
  • Cleaning the concrete slab of all adhesive residue
  • Treating cracks, hairline cracks and pipe openings
  • Applying a continuous waterproof layer over the full interior
How we work

The stages of the work in Warehouse Area

1

Send photos of the pool

On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.

2

Drain and strip

The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.

3

Treat cracks and joints

The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.

4

Re-waterproof and refinish

The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.

What sets us apart

Why Abraj Al Azl?

Stopping the deterioration before it spreadsA small crack widens, and concrete that absorbs water crumbles. Renovating at the right time protects the slab and the reinforcement from deeper damage.

Start from Warehouse Area with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Warehouse Area is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Mosaic-tiled seaside pool
Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool renovation in Warehouse Area

Must all tiles be replaced, or can only the damaged sections be repaired?

It depends on how much tile is cracked and crumbling and the condition of the grout beneath. The photos show whether spot repairs will suffice or comprehensive renovation is better to ensure no fresh leaks.

How long does pool renovation take in the Warehouse Area?

The duration varies by pool size and extent of damage. Once you send photos and we speak, we will tell you the steps involved.

What decides the cost of renovating a pool?

The size of the interior surface, the depth of the pool, how much of the tiling or plaster has failed, the number and location of cracks, the finish chosen whether tile or plaster, and how easily the site can be reached. Send photos and rough dimensions on WhatsApp and we will advise on the right treatment.

What should I send you from Warehouse Area?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Warehouse Area, and we will work out the next step with you.

Does the pool have to be fully drained for renovation?

Yes. Renovating the interior surface requires the pool to be fully drained so the tiles or plaster can be stripped, the cracks in the concrete slab treated and the waterproof layer applied to a dry surface. The work cannot be done with water in the pool.

What is the difference between repairing one crack and a full pool renovation?

Repairing one crack suits a pool whose interior is mostly sound and the problem is isolated. When loose tiles, cracks and stains multiply and the leak has returned despite repairs, the waterproof layer and the finish have both reached the end of their life and full renovation is needed. Photos help decide which fits.

Nearby areas

Pool renovation near Warehouse Area

We also offer pool renovation in Al Majidiyah, Al Aqiq (near Inak) and Ash Shweikah, among the closest areas to Warehouse Area.

Other services in the area

More services in Warehouse Area

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Warehouse Area
and we will plan the next step with you

Call us or send photos of the pool interior on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp