
Pool renovation in Hajr District
Pool renovation in Hajr District starts with photos of the pool, its coping and its floor, sent by call or WhatsApp. The district has villas and houses with private pools, many of which have aged over the years.
The houses in Hajr range from villas to smaller homes on varied plot sizes, and many of their private pools were built years ago. Older pools commonly show cracked tiles and flaking plaster along the edges and corners, and water can leak through joints without being obvious. Renovation depends on the concrete structure beneath the finish, so the photos show what must be removed and what can stay.
- Hajr District is a residential district in Al-Ahsa in the Eastern Province, close to King Faisal University Third and Al Hizam Al Akhdar District.
- Old finishes usually have to be fully stripped before a new waterproofing layer can bond to the concrete.
What we do for you in Hajr District
- Treating cracks, hairline cracks and pipe openings
- Laying new tiles or applying new plaster once cured
- Cleaning the concrete slab of all adhesive residue
- Sealing the waterproofing at drain openings and water returns
The steps of pool renovation in Hajr District
Send photos of the pool
On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.
Drain and strip
The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.
Treat cracks and joints
The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.
Re-waterproof and refinish
The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.
Why Abraj Al Azl?
A sound interior from the base upTreating cracks, then waterproofing, then finishing in the right order means each layer does its job and nothing is hidden beneath.
We serve Hajr District and around itIncluding King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District, as part of our work across the Eastern Province.
Hajr District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Hajr District
Can a pool in Hajr District be renovated without fully draining it?
It depends on the work required, since stripping tiles and treating cracks usually means emptying the basin. The photos will show what can be done with water in place and what needs draining.
What is checked first in an older pool in Hajr District?
We check the edges, the joints, the areas where plaster has flaked and any wall cracks, since these are usually where leaks start. Then we decide whether the problem is only in the finish or reaches the concrete.
Do you cover Hajr District?
Yes. We serve Hajr District and nearby areas such as King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Does the pool have to be fully drained for renovation?
Yes. Renovating the interior surface requires the pool to be fully drained so the tiles or plaster can be stripped, the cracks in the concrete slab treated and the waterproof layer applied to a dry surface. The work cannot be done with water in the pool.
What decides the cost of renovating a pool?
The size of the interior surface, the depth of the pool, how much of the tiling or plaster has failed, the number and location of cracks, the finish chosen whether tile or plaster, and how easily the site can be reached. Send photos and rough dimensions on WhatsApp and we will advise on the right treatment.
What should I prepare before the renovation begins?
The pool needs to be drained, any pump or filter that can be disconnected removed, and a clear route kept for taking out stripped tiles and debris. When the job is agreed we will tell you what else needs to be ready based on your site.
Areas near Hajr District
We also work near Hajr District, in King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District.
More services in Hajr District



