
Pool renovation in Ayn Musa District
Pool renovation in Ayn Musa District begins with photos of the pool and its surroundings, sent by call or WhatsApp. The district has villas and apartment buildings of varied age, many with private pools requiring new waterproofing and finishing.
Pools in the district vary greatly by building age. Older villas have small baths with aged plaster or tiles already crumbling from wear, while newer buildings have larger tanks. Salty water near the surface and intense summer heat stress the waterproofing and finish. Renovation involves removing all damage and starting fresh with modern waterproofing. Each pool is different, and photos determine what is needed before starting.
- Ayn Musa District is a residential area in the Eastern Province, close to As Salhiyah District, An Nasriyah District and Al Olaya District, with villas and apartment buildings.
- Pools in older residential areas may have multiple layers of tiles and different waterproofing materials, which complicates renovation.
What we do for you in Ayn Musa District
- Draining the pool and stripping failing tiles or plaster
- Treating cracks, hairline cracks and pipe openings
- Applying a continuous waterproof layer over the full interior
- Sealing the waterproofing at drain openings and water returns
The steps of pool renovation in Ayn Musa District
Send photos of the pool
On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.
Drain and strip
The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.
Treat cracks and joints
The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.
Re-waterproof and refinish
The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.
Why Abraj Al Azl?
A sound interior from the base upTreating cracks, then waterproofing, then finishing in the right order means each layer does its job and nothing is hidden beneath.
Start from Ayn Musa District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Ayn Musa District and around itIncluding As Salhiyah District, An Nasriyah District and Al Olaya District, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool renovation in Ayn Musa District
Can a very old pool in the district be renovated at all?
In most cases yes, if the underlying concrete is sound. Removing all old tiles, plaster and waterproofing, then treating cracks and applying new waterproofing, can give an old pool new life. Photos will show if the concrete is severely damaged, and we will tell you honestly.
How long does a renovated pool need to dry before use?
That depends on the waterproofing type and climate. The waterproofing must dry completely before filling, and we will advise you on the appropriate time for your pool's material.
Does the pool have to be fully drained for renovation?
Yes. Renovating the interior surface requires the pool to be fully drained so the tiles or plaster can be stripped, the cracks in the concrete slab treated and the waterproof layer applied to a dry surface. The work cannot be done with water in the pool.
Is Ayn Musa District within your service area?
Yes, Ayn Musa District is one of the areas we work in, as are As Salhiyah District, An Nasriyah District and Al Olaya District. To start, call us or message us on WhatsApp.
What should I prepare before the renovation begins?
The pool needs to be drained, any pump or filter that can be disconnected removed, and a clear route kept for taking out stripped tiles and debris. When the job is agreed we will tell you what else needs to be ready based on your site.
Can new tiles go over the old ones?
Usually not. Old tiles that are loose or whose adhesive has failed will not give the new tiles a stable base, and they may hide cracks in the concrete slab that need treating. Stripping back completely means the waterproof layer and the new tiles sit on a sound surface.
The same service in nearby areas
Nearby areas we also cover: As Salhiyah District, An Nasriyah District and Al Olaya District.
More services in Ayn Musa District



