Abraj Al AzlContracting
Call العربية
Indoor mosaic-tiled pool

Pool renovation in Ash Shuqayq

The pool deserves a fresh start

Full renovation of ageing pools: stripping damaged tiles or plaster, treating cracks, re-waterproofing and refinishing

+966 54 311 2066
The service in your area

Pool renovation in Ash Shuqayq

Pool renovation in Ash Shuqayq starts with photos of the basin and the ground and wall around it, received by call or WhatsApp. Homes in the district tend to have wide yards, and the pools vary accordingly.

Homes in Ash Shuqayq tend to have fairly wide yards, so basins sit in positions exposed to sun and wind. Outer edges can crack as the ground expands and contracts, and joints are affected. Sand and dust can gather around the basin, hiding edges and concealing leaks. The photos reveal these spots and show what needs treating.

  • Ash Shuqayq is a district in Dammam in the Eastern Province, close to Al Mutayrifi, Al Qurayn and Julayjilah.
  • Ground movement around a basin breaks its outer joints, and leaks often start there.
What the service includes

The main items of pool renovation in Ash Shuqayq

  • Sealing the waterproofing at drain openings and water returns
  • Treating cracks, hairline cracks and pipe openings
  • Draining the pool and stripping failing tiles or plaster
  • Cleaning the concrete slab of all adhesive residue
How we work

The stages of the work in Ash Shuqayq

1

Send photos of the pool

On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.

2

Drain and strip

The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.

3

Treat cracks and joints

The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.

4

Re-waterproof and refinish

The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.

What sets us apart

Why Abraj Al Azl?

A sound interior from the base upTreating cracks, then waterproofing, then finishing in the right order means each layer does its job and nothing is hidden beneath.

Your request from Ash Shuqayq comes to usCall or WhatsApp on one number, and we answer you ourselves.

Ash Shuqayq is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Mosaic-tiled seaside pool
Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool renovation in Ash Shuqayq

Do damages in Ash Shuqayq often begin at the outer edges?

Often yes, because of ground movement and expansion and contraction. The photos check the outer edges first to see whether they are the source.

Can sand around the pool hide a leak problem?

Yes, sand can cover edges and joints so the signs are not clear. That is why we ask for clear photos from several angles before judging the condition.

What is the difference between repairing one crack and a full pool renovation?

Repairing one crack suits a pool whose interior is mostly sound and the problem is isolated. When loose tiles, cracks and stains multiply and the leak has returned despite repairs, the waterproof layer and the finish have both reached the end of their life and full renovation is needed. Photos help decide which fits.

What should I prepare before the renovation begins?

The pool needs to be drained, any pump or filter that can be disconnected removed, and a clear route kept for taking out stripped tiles and debris. When the job is agreed we will tell you what else needs to be ready based on your site.

Do you offer pool renovation in Ash Shuqayq?

Yes. Ash Shuqayq is within our service area in the Eastern Province, and we also work in Al Mutayrifi, Al Qurayn and Julayjilah. Call us or send photos of the spot on WhatsApp.

Does the pool have to be fully drained for renovation?

Yes. Renovating the interior surface requires the pool to be fully drained so the tiles or plaster can be stripped, the cracks in the concrete slab treated and the waterproof layer applied to a dry surface. The work cannot be done with water in the pool.

Nearby areas

Areas near Ash Shuqayq

We also offer pool renovation in Al Mutayrifi, Al Qurayn and Julayjilah, among the closest areas to Ash Shuqayq.

Other services in the area

More services in Ash Shuqayq

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Ash Shuqayq
with one call

Call us or send photos of the pool interior on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp