Abraj Al AzlContracting
Call العربية
Indoor mosaic-tiled pool

Pool renovation in Al Yaqoot

The pool deserves a fresh start

Full renovation of ageing pools: stripping damaged tiles or plaster, treating cracks, re-waterproofing and refinishing

+966 54 311 2066
The service in your area

Pool renovation in Al Yaqoot

Pool renovation in Al Yaqoot starts with a photo or call showing the pool's condition, tiles and walls. The district has villas and apartment buildings, many with private pools that need full renewal after years of use and exposure to heat and moisture.

Al Yaqoot comprises villas and apartment blocks of various sizes, and many properties have private pools. An older pool typically shows cracks in tiles and walls from soil movement and intense heat, and water may leak from joints or the floor. Pool renovation starts with removing damaged tiles and plaster, treating cracks and joints, then re-waterproofing the entire pool before retiling. Photos tell us the scope of damage and whether the concrete structure is sound or needs reinforcement.

  • Al Yaqoot is a district in the Eastern Province near Al Jarudiyah and Al Badiah, with villas and residential apartment blocks.
  • A private pool in a villa is exposed to direct sun all day, so heat stresses old tiles and waterproofing.
What the service includes

The scope of the work in Al Yaqoot

  • Laying new tiles or applying new plaster once cured
  • Sealing the waterproofing at drain openings and water returns
  • Cleaning the concrete slab of all adhesive residue
  • Draining the pool and stripping failing tiles or plaster
How we work

From first contact to the finished job in Al Yaqoot

1

Send photos of the pool

On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.

2

Drain and strip

The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.

3

Treat cracks and joints

The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.

4

Re-waterproof and refinish

The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.

What sets us apart

Why Abraj Al Azl?

A sound interior from the base upTreating cracks, then waterproofing, then finishing in the right order means each layer does its job and nothing is hidden beneath.

Your request from Al Yaqoot comes to usCall or WhatsApp on one number, and we answer you ourselves.

Pool renovation in Al YaqootWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Mosaic-tiled seaside pool
Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool renovation in Al Yaqoot

Must all pool tiles be replaced or can only the damaged parts be fixed?

It depends on the extent of damage. If damage is localized we may repair only affected areas, but when cracks run under tiles or in the walls, patching tiles alone won't stop leaks, and photos will show the right solution.

How long does pool renovation in Al Yaqoot take?

Duration varies by pool size, severity of damage and treatments needed. After you send photos we will outline the stages and requirements so you can plan accordingly.

Does the pool have to be fully drained for renovation?

Yes. Renovating the interior surface requires the pool to be fully drained so the tiles or plaster can be stripped, the cracks in the concrete slab treated and the waterproof layer applied to a dry surface. The work cannot be done with water in the pool.

How do I request pool renovation in Al Yaqoot?

Call us, or send clear photos of the spot and its location in Al Yaqoot on WhatsApp, and we will work out the next step with you.

What should I prepare before the renovation begins?

The pool needs to be drained, any pump or filter that can be disconnected removed, and a clear route kept for taking out stripped tiles and debris. When the job is agreed we will tell you what else needs to be ready based on your site.

Can new tiles go over the old ones?

Usually not. Old tiles that are loose or whose adhesive has failed will not give the new tiles a stable base, and they may hide cracks in the concrete slab that need treating. Stripping back completely means the waterproof layer and the new tiles sit on a sound surface.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Jarudiyah (near Qatif), Al Badiah and Al Jarudiyah (near Imhaish).

Other services in the area

More services in Al Yaqoot

Worker applying the white insulation layer on a villa roof by the sea

Pool renovation in Al Yaqoot?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp