Abraj Al AzlContracting
Call العربية
Indoor mosaic-tiled pool

Pool renovation in Al Salmaniyah First District

The pool deserves a fresh start

Full renovation of ageing pools: stripping damaged tiles or plaster, treating cracks, re-waterproofing and refinishing

+966 54 311 2066
The service in your area

Pool renovation in Al Salmaniyah First District

Pool renovation in Al Salmaniyah First District starts with WhatsApp photos and details of the pool's condition. The district has varied villas and residential buildings with old and new private pools. Renovation includes removing damaged tiles and plaster, treating cracks, re-waterproofing and refinishing.

Al Salmaniyah First District has villas and residential buildings of varying ages, with pools differing greatly in size, material and condition. Older pools show concrete cracks, tile and plaster wear and potential leaks, while newer ones may only need the waterproofing layer renewed. Climate humidity and sun heat strongly affect pool materials over time. Clear photos from different angles help pinpoint the exact renovation scope needed.

  • Al Salmaniyah First District is a residential district in the Eastern Province near Al Muhammadiyah District, Al Salmaniyah Second District and Ayn Najm District.
  • Pools in residential buildings and villas face ongoing weather and water exposure causing cracks and wear to plaster, tiles and waterproofing.
What the service includes

The main items of pool renovation in Al Salmaniyah First District

  • Sealing the waterproofing at drain openings and water returns
  • Applying a continuous waterproof layer over the full interior
  • Draining the pool and stripping failing tiles or plaster
  • Laying new tiles or applying new plaster once cured
How we work

How we carry out pool renovation in Al Salmaniyah First District

1

Send photos of the pool

On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.

2

Drain and strip

The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.

3

Treat cracks and joints

The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.

4

Re-waterproof and refinish

The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.

What sets us apart

Why Abraj Al Azl?

A sound interior from the base upTreating cracks, then waterproofing, then finishing in the right order means each layer does its job and nothing is hidden beneath.

We serve Al Salmaniyah First District and around itIncluding Al Muhammadiyah District, Al Salmaniyah Second District and Ayn Najm District, as part of our work across the Eastern Province.

Your request from Al Salmaniyah First District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Mosaic-tiled seaside pool
Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool renovation in Al Salmaniyah First District

Must a pool in Al Salmaniyah First District be replaced or can it be renovated?

In most cases it can be renovated if the concrete structure is not severely damaged. We remove damaged tiles and plaster, treat cracks and re-waterproof. Photos show whether the structure is sound or needs more than renovation.

Do pools in villas and buildings in Al Salmaniyah First District face particular moisture problems?

Pools in residential areas face ongoing moisture and heat, potentially causing leaks and waterproofing wear. Photos reveal the location of moisture or leaks so we can choose the best treatment approach.

Is Al Salmaniyah First District within your service area?

Yes, Al Salmaniyah First District is one of the areas we work in, as are Al Muhammadiyah District, Al Salmaniyah Second District and Ayn Najm District. To start, call us or message us on WhatsApp.

What is the difference between repairing one crack and a full pool renovation?

Repairing one crack suits a pool whose interior is mostly sound and the problem is isolated. When loose tiles, cracks and stains multiply and the leak has returned despite repairs, the waterproof layer and the finish have both reached the end of their life and full renovation is needed. Photos help decide which fits.

What signs tell me a rough pool surface is more than just age?

Roughness alone can be normal ageing, but if it comes with visible flaking, brown or grey stains that cleaning will not shift, tiles that move or a falling water level, the plaster or the waterproof layer beneath is well into its deterioration. Send photos of the surface and we will assess it.

Can new tiles go over the old ones?

Usually not. Old tiles that are loose or whose adhesive has failed will not give the new tiles a stable base, and they may hide cracks in the concrete slab that need treating. Stripping back completely means the waterproof layer and the new tiles sit on a sound surface.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Salmaniyah First District, the same service is available in Al Muhammadiyah District, Al Salmaniyah Second District and Ayn Najm District.

Other services in the area

More services in Al Salmaniyah First District

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Salmaniyah First District
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp