
Pool renovation in Al Quds District
Pool renovation in Al Quds District starts by sending photos via call or WhatsApp. The district has villas and apartment buildings with private and shared pools showing signs of age and continuous use.
Pools in Al Quds face typical pressures: intense heat, humidity and climate stress. Tile chips and plaster crumbles, especially around openings and joints, and leaks become inevitable. Full renovation involves stripping damaged layers, treating cracks and leaks, then new waterproofing and finish. Damage type and size vary pool to pool, and photos pinpoint exactly what is needed.
- Al Quds District is a residential district in the Eastern Province, close to Al Muhandisin District, Al Badriyah District and As Suqur District.
- Tile on sun-exposed pools gradually loses its bond with the base, increasing the risk of leaks and collapse.
What we do for you in Al Quds District
- Cleaning the concrete slab of all adhesive residue
- Draining the pool and stripping failing tiles or plaster
- Laying new tiles or applying new plaster once cured
- Applying a continuous waterproof layer over the full interior
The stages of the work in Al Quds District
Send photos of the pool
On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.
Drain and strip
The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.
Treat cracks and joints
The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.
Re-waterproof and refinish
The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.
Why Abraj Al Azl?
A sound interior from the base upTreating cracks, then waterproofing, then finishing in the right order means each layer does its job and nothing is hidden beneath.
Pool renovation in Al Quds DistrictWe choose the method and the materials once we know the condition of the spot.
We serve Al Quds District and around itIncluding Al Muhandisin District, Al Badriyah District and As Suqur District, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on pool renovation in Al Quds District
Can a pool in Al Quds be repaired without removing all the tile?
If damage is localised, we may treat only affected areas. But if tile is chipped or plaster damaged over wide areas, full renovation becomes necessary for long-term safety. Photos clarify the condition.
Does a pool leak always mean the concrete structure is faulty?
Not always. Leaks often come from damaged tile, plaster or joints before reaching the concrete. Photos and assessment pinpoint the leak source clearly before choosing the solution.
Do you offer pool renovation in Al Quds District?
Yes. Al Quds District is within our service area in the Eastern Province, and we also work in Al Muhandisin District, Al Badriyah District and As Suqur District. Call us or send photos of the spot on WhatsApp.
What decides the cost of renovating a pool?
The size of the interior surface, the depth of the pool, how much of the tiling or plaster has failed, the number and location of cracks, the finish chosen whether tile or plaster, and how easily the site can be reached. Send photos and rough dimensions on WhatsApp and we will advise on the right treatment.
Can new tiles go over the old ones?
Usually not. Old tiles that are loose or whose adhesive has failed will not give the new tiles a stable base, and they may hide cracks in the concrete slab that need treating. Stripping back completely means the waterproof layer and the new tiles sit on a sound surface.
What should I prepare before the renovation begins?
The pool needs to be drained, any pump or filter that can be disconnected removed, and a clear route kept for taking out stripped tiles and debris. When the job is agreed we will tell you what else needs to be ready based on your site.
Areas near Al Quds District
Nearby areas we also cover: Al Muhandisin District, Al Badriyah District and As Suqur District.
More services in Al Quds District



