Abraj Al AzlContracting
Call العربية
Indoor mosaic-tiled pool

Pool renovation in Al Qadisiyah

The pool deserves a fresh start

Full renovation of ageing pools: stripping damaged tiles or plaster, treating cracks, re-waterproofing and refinishing

+966 54 311 2066
The service in your area

Pool renovation in Al Qadisiyah

Pool renovation in Al Qadisiyah starts with photos and details sent by call or WhatsApp. The district has residential villas and some apartment buildings with gardens and courtyards, many containing pools needing fresh coatings and waterproofing.

Al Qadisiyah homes vary in age and size, as do their pools. Some pools are old with severely cracked linings, others newer but with peeling coatings from heat and dryness. Pool renovation first requires removing damaged plaster and broken tiles, checking and filling cracks, then re-waterproofing and recoating the surface. Your photos show the damage location and type, helping us determine the scope and right materials.

  • Al Qadisiyah is a residential district in the Eastern Province, near Ghirnatah, Ad Dabab and Ettisalat, comprising villas and apartment buildings.
  • Most residential pools are exposed to sun all day, requiring a lining and coating that withstands ultraviolet rays.
What the service includes

The pool renovation work in Al Qadisiyah

  • Treating cracks, hairline cracks and pipe openings
  • Laying new tiles or applying new plaster once cured
  • Draining the pool and stripping failing tiles or plaster
  • Applying a continuous waterproof layer over the full interior
How we work

This is how we work in Al Qadisiyah

1

Send photos of the pool

On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.

2

Drain and strip

The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.

3

Treat cracks and joints

The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.

4

Re-waterproof and refinish

The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.

What sets us apart

Why Abraj Al Azl?

Stopping the deterioration before it spreadsA small crack widens, and concrete that absorbs water crumbles. Renovating at the right time protects the slab and the reinforcement from deeper damage.

Al Qadisiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Qadisiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Mosaic-tiled seaside pool
Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool renovation in Al Qadisiyah

Must an old lining be completely removed?

If the old lining is mostly sound and cracks are few and limited, we may repair the cracks and apply a new lining over it. But if it is widely cracked, removing it ensures a strong foundation for the new lining, which your photos will clarify.

Can a pool in Al Qadisiyah be renovated in a short timeframe?

That depends on the pool's condition, size, extent of cracks and damage. Your photos show the full picture, then we advise you of the steps and expected duration before starting.

What is the difference between repairing one crack and a full pool renovation?

Repairing one crack suits a pool whose interior is mostly sound and the problem is isolated. When loose tiles, cracks and stains multiply and the leak has returned despite repairs, the waterproof layer and the finish have both reached the end of their life and full renovation is needed. Photos help decide which fits.

Can new tiles go over the old ones?

Usually not. Old tiles that are loose or whose adhesive has failed will not give the new tiles a stable base, and they may hide cracks in the concrete slab that need treating. Stripping back completely means the waterproof layer and the new tiles sit on a sound surface.

What should I send you from Al Qadisiyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Qadisiyah, and we will work out the next step with you.

What should I prepare before the renovation begins?

The pool needs to be drained, any pump or filter that can be disconnected removed, and a clear route kept for taking out stripped tiles and debris. When the job is agreed we will tell you what else needs to be ready based on your site.

Nearby areas

Pool renovation near Al Qadisiyah

We also work near Al Qadisiyah, in Ghirnatah (near Dammam), Ad Dabab (near Al Athir) and Ettisalat.

Other services in the area

More services in Al Qadisiyah

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Al Qadisiyah
with one call

Call us or send photos of the pool interior on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp