Abraj Al AzlContracting
Call العربية
Indoor mosaic-tiled pool

Pool renovation in Al Marbidia District

The pool deserves a fresh start

Full renovation of ageing pools: stripping damaged tiles or plaster, treating cracks, re-waterproofing and refinishing

+966 54 311 2066
The service in your area

Pool renovation in Al Marbidia District

Pool renovation in Al Marbidia District starts with WhatsApp messages carrying photos of the basin, floor and walls. The district has villas and homes where pools need regular maintenance due to harsh climate and continuous use.

Private pools in Al Marbidia villas experience constant wear from heat, moisture and regular use. Wear appears as cracks in floors, loose wall tiles, or dark staining and buildup on linings. Joints and seams between floor and walls are most vulnerable to leaks. Renovation includes thorough cleaning, concrete inspection, crack repair, re-waterproofing and new finishes.

  • Al Marbidia District is a residential district in Al Ahsa within the Eastern Province, close to Al Mirqab, Al Uwaimiriyah and As Sunaidah Districts.
  • Repeated pool use combined with intense heat accelerates deterioration of both waterproofing and finishes.
What the service includes

The main items of pool renovation in Al Marbidia District

  • Applying a continuous waterproof layer over the full interior
  • Sealing the waterproofing at drain openings and water returns
  • Laying new tiles or applying new plaster once cured
  • Cleaning the concrete slab of all adhesive residue
How we work

From first contact to the finished job in Al Marbidia District

1

Send photos of the pool

On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.

2

Drain and strip

The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.

3

Treat cracks and joints

The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.

4

Re-waterproof and refinish

The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.

What sets us apart

Why Abraj Al Azl?

A sound interior from the base upTreating cracks, then waterproofing, then finishing in the right order means each layer does its job and nothing is hidden beneath.

Start from Al Marbidia District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Marbidia District and around itIncluding Al Mirqab District, Al Uwaimiriyah District and As Sunaidah District, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Mosaic-tiled seaside pool
Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool renovation in Al Marbidia District

Will a leak appear if the lining is old?

Usually yes. Old linings become brittle and crack easily, allowing water to seep to underlying layers. Photos will show whether the lining is degrading and whether the base waterproofing needs repair.

Do you work on pools in the district during summer?

Yes, we serve Al Marbidia District. Timing depends on the work scope and weather conditions then. Send photos and basic details so we can discuss options with you.

Do you offer pool renovation in Al Marbidia District?

Yes. Al Marbidia District is within our service area in the Eastern Province, and we also work in Al Mirqab District, Al Uwaimiriyah District and As Sunaidah District. Call us or send photos of the spot on WhatsApp.

What is the difference between repairing one crack and a full pool renovation?

Repairing one crack suits a pool whose interior is mostly sound and the problem is isolated. When loose tiles, cracks and stains multiply and the leak has returned despite repairs, the waterproof layer and the finish have both reached the end of their life and full renovation is needed. Photos help decide which fits.

What should I prepare before the renovation begins?

The pool needs to be drained, any pump or filter that can be disconnected removed, and a clear route kept for taking out stripped tiles and debris. When the job is agreed we will tell you what else needs to be ready based on your site.

Can new tiles go over the old ones?

Usually not. Old tiles that are loose or whose adhesive has failed will not give the new tiles a stable base, and they may hide cracks in the concrete slab that need treating. Stripping back completely means the waterproof layer and the new tiles sit on a sound surface.

Nearby areas

Areas near Al Marbidia District

We also offer pool renovation in Al Mirqab District, Al Uwaimiriyah District and As Sunaidah District, among the closest areas to Al Marbidia District.

Other services in the area

More services in Al Marbidia District

Worker applying the white insulation layer on a villa roof by the sea

Pool renovation in Al Marbidia District?
Call us now

Describe the problem and where it is in Al Marbidia District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp