
Pool renovation in Al Khalidiyah Al Janubiyah
Pool renovation in Al Khalidiyah Al Janubiyah begins with photos sent by call or WhatsApp. The district has closely packed villas and apartment buildings with pools suffering lining cracks and leaks from heavy use and heat.
Pools in Al Khalidiyah Al Janubiyah see heavy use, especially in summer, stressing the lining and waterproofing. Chlorine and UV rays weaken old material, causing cracks and leaks. Damp soil around some pools may increase pressure on walls and foundations. Removing damaged finishes, cleaning the surface, carefully filling cracks, then applying new waterproofing and durable lining restore the pool. Photos show the work's scope and the best material for intensive use.
- Al Khalidiyah Al Janubiyah is a district in the Eastern Province, close to Al Hussam, Al Khalidiyah Ash Shamaliyah and First Industrial, with villas and apartment buildings.
- Heavy pool use shortens lining life, and cracks and leaks appear faster than in lightly used pools.
The main items of pool renovation in Al Khalidiyah Al Janubiyah
- Laying new tiles or applying new plaster once cured
- Applying a continuous waterproof layer over the full interior
- Treating cracks, hairline cracks and pipe openings
- Sealing the waterproofing at drain openings and water returns
From first contact to the finished job in Al Khalidiyah Al Janubiyah
Send photos of the pool
On WhatsApp: photos of any loose or cracked tiles, the interior surface, any visible cracks, and the area around pipe openings and returns, so we can read the damage and decide what the work involves.
Drain and strip
The pool is drained, the failing tiles or plaster are stripped back to the bare concrete slab, and the surface is cleaned of all adhesive residue and debris.
Treat cracks and joints
The concrete slab is examined and cracks, hairline cracks, pipe openings and drain outlets are treated, each according to what it needs, before any layer goes on.
Re-waterproof and refinish
The waterproof layer covers the full interior, turns up at the walls and closes around every opening, then tiles are laid or new plaster is applied once it has cured, and the pool is refilled.
Why Abraj Al Azl?
Stopping the deterioration before it spreadsA small crack widens, and concrete that absorbs water crumbles. Renovating at the right time protects the slab and the reinforcement from deeper damage.
Your request from Al Khalidiyah Al Janubiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Pool renovation in Al Khalidiyah Al JanubiyahWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Questions about pool renovation in Al Khalidiyah Al Janubiyah
Can a heavily used pool be renovated without long downtime?
Yes, but the pool must be completely drained to remove lining and address cracks and waterproofing. Time depends on its size and condition. Send clear photos and we will tell you how long the work takes after reviewing them.
Does new lining withstand high-use pools and heavy chlorine?
Yes, materials are designed to withstand chlorine, heavy use and heat. Material choice is based on pool size and expected use. Send photos showing condition and usage, and we will recommend the best option.
Does the pool have to be fully drained for renovation?
Yes. Renovating the interior surface requires the pool to be fully drained so the tiles or plaster can be stripped, the cracks in the concrete slab treated and the waterproof layer applied to a dry surface. The work cannot be done with water in the pool.
What is the difference between repairing one crack and a full pool renovation?
Repairing one crack suits a pool whose interior is mostly sound and the problem is isolated. When loose tiles, cracks and stains multiply and the leak has returned despite repairs, the waterproof layer and the finish have both reached the end of their life and full renovation is needed. Photos help decide which fits.
Is Al Khalidiyah Al Janubiyah within your service area?
Yes, Al Khalidiyah Al Janubiyah is one of the areas we work in, as are Al Hussam, Al Khalidiyah Ash Shamaliyah and First Industrial (near Dammam). To start, call us or message us on WhatsApp.
What should I prepare before the renovation begins?
The pool needs to be drained, any pump or filter that can be disconnected removed, and a clear route kept for taking out stripped tiles and debris. When the job is agreed we will tell you what else needs to be ready based on your site.
The same service in nearby areas
If the site is outside Al Khalidiyah Al Janubiyah, the same service is available in Al Hussam, Al Khalidiyah Ash Shamaliyah and First Industrial (near Dammam).
More services in Al Khalidiyah Al Janubiyah



