
Plumbing first-fix in Makkah
Plumbing first-fix in Makkah begins with photos of the site and plan sent by call or WhatsApp. Makkah is a residential district with villas and apartment buildings in different designs. Pipe routes before construction are planned based on the architectural design and available space.
The district has diverse building types: villas of different sizes and designs, and apartment buildings of several storeys. Plumbing first-fix in this diversity requires careful study of each site. Villas may allow more flexible horizontal pipe distribution, while apartment buildings need strict organisation of vertical pipes in columns and walls. Water supply and drainage must run through walls and floors efficiently and be protected from stress and damp. Photos help us understand the architectural pattern and choose the best routes.
- Makkah is a district in the Eastern Province, near Al Fanatir, Najd and Al Hijaz, with villas and apartment buildings.
- Cold and hot water pipes must be protected and secured separately before walls are closed.
What we do for you in Makkah
- Laying hot and cold supply pipes inside walls and floors
- Pressure-testing supply pipes before the walls are closed
- Running drainage pipes and setting their falls
- Securing each outlet firmly in its set position
This is how we work in Makkah
Send the site plans
On WhatsApp: photos of the site or the engineering drawings, or the planned positions of bathrooms and kitchens, so we can read the required runs and identify the supply and drainage points.
Mark the runs and outlet positions
Pipe runs are marked on the walls and floors, outlet positions are fixed and pipe sizes are chosen for each point before any cutting or chasing begins.
Lay the pipes and set the falls
Supply pipes and drainage pipes are laid in the marked runs, the drainage falls are set so the water flows freely without ponding, and each outlet is secured in its position.
Pressure test before closing
Supply pipes are pressure-tested and drainage lines are flushed with water before the walls are closed or the floors are poured, so any leak is found and fixed before the plaster goes on.
Why Abraj Al Azl?
The first fix prepares the waterproofingWhen outlet and drain positions are fixed and known, the bathroom and floor waterproofing that follows runs without unexpected adjustments.
Makkah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve Makkah and around itIncluding Al Fanatir, Najd and Al Hijaz, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Makkah
How are hot and cold water pipes handled in plumbing first-fix in Makkah?
Cold and hot water pipes are run separately to avoid heat loss. They are fixed so they are far apart from each other and from drainage pipes. Protection from heat, cold and pressure matters before walls are sealed with plaster and tiles.
Can plumbing first-fix in an older building in Makkah be done without a complete redesign?
It is possible if the structural frame is sound and the walls and floors provide enough space. Photos and plans will show what is feasible and what constrains us. We may need minor adjustments but the aim is to avoid complete rebuilding.
When is the pressure test done and what does it find?
The pressure test is done on supply pipes just before the walls are closed or the floors are poured. It finds any leak at joints, bends or outlet positions while the pipe is still exposed. Any leak is fixed at once and the test is repeated before closing.
Do you cover Makkah?
Yes. We serve Makkah and nearby areas such as Al Fanatir, Najd and Al Hijaz, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Should the first fix be coordinated with bathroom waterproofing?
Yes. Every outlet and drain position affects how the floor and wall waterproofing is applied later. When the positions are fixed and known before the waterproofing starts, sealing the layer around each point without gaps is straightforward. Coordinating from the start is the better way.
Why is a first-fix mistake hard to put right after plastering?
Once the walls are closed and the floors are poured, the pipes are completely hidden. A wrong outlet position, a bad drainage fall or an undersized pipe means opening the plaster, breaking tiles or digging the floor to reach it, which costs far more in effort and money than fixing it before the walls were closed.
We also offer it in neighbouring areas
We also work near Makkah, in Al Fanatir, Najd and Al Hijaz.
More services in Makkah




