Abraj Al AzlContracting
Call العربية
Workers on a lift spraying foam under the metal roof of a warehouse

Hangar & warehouse insulation in Al Aziziyah Second District

Foam stops the heat

Foam insulation sprayed on large metal hangar and warehouse roofs

+966 54 311 2066
The service in your area

Hangar & warehouse insulation in Al Aziziyah Second District

Hangar and warehouse insulation in Al Aziziyah Second District starts with photos of the metal roof sent by call or WhatsApp. The district has warehouses with varied metal roofs exposed to high heat and climate swings, and effective insulation preserves goods and equipment.

Al Aziziyah Second District has warehouses and storage facilities with metal roofs of different ages and conditions. Intense summer heat penetrates exposed roofs and raises interior temperatures sharply, affecting stored goods and sensitive equipment. Humidity causes condensation on roofs and walls, especially at night and early morning, which can lead to moisture damage or corrosion. Sprayed foam provides uniform thermal insulation and reduces temperature differences, and photos determine each warehouse's needs.

  • Al Aziziyah Second District is an area in the Eastern Province, close to Al Bandariyah District, An Nayfiyah District and Al Hufayrah District, with multiple warehouses and industrial workshops.
  • Uninsulated metal roof warehouses see large temperature swings between night and day, which increases condensation-related problems.
What the service includes

The hangar & warehouse insulation work in Al Aziziyah Second District

  • Treating the areas around ventilation and lighting openings
  • Spraying polyurethane foam in continuous layers on the sheet
  • Cleaning the surface of dust and grease before spraying
  • Covering joints, edges and openings without gaps
How we work

The stages of the work in Al Aziziyah Second District

1

Send photos of the hangar

On WhatsApp: photos of the roof from inside and out, the rough floor area and the sheet type, so we can decide the best method and how to carry out the work.

2

Inspect and prepare the surface

The metal surface is checked, rusty areas are treated, loose screws are tightened, and the surface is cleaned of dust and grease before spraying so the foam bonds firmly.

3

Spray the foam in layers

Polyurethane foam is sprayed on the sheet from the inside or the outside depending on the building design, covering joints, edges and the areas around openings without leaving gaps.

4

Apply the protective coating

The foam is left to cure, then a protective coating is applied over it to shield it from UV and weather and extend its service life.

What sets us apart

Why Abraj Al Azl?

No condensation, no inside rustThe foam covers the inner face of the sheet, so moisture has no cold surface to settle on, and the metal is protected from rust caused by trapped damp.

Start from Al Aziziyah Second District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Aziziyah Second District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
Black bitumen membrane laid on a floor around two pipe stubs
Empty seaside pool during waterproofing
Mosaic-tiled seaside pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book hangar & warehouse insulation in Al Aziziyah Second District

Does foam prevent the condensation that forms at night in a warehouse?

Foam reduces the temperature difference between the roof and indoor air at night, which reduces condensation. It does not eliminate it completely with very high humidity, but photos show the situation and we advise the best solution.

How does insulation protect heat-sensitive equipment in a warehouse?

Insulation stabilises interior temperature and reduces sharp swings between day and night. Sensitive equipment stays in a more stable environment, which extends its life and reduces failures. Photos help us estimate the impact on your current equipment condition.

Can a hangar be insulated while it is in use, or must it be cleared?

The work area should be cleared of stock to allow proper access and to protect goods from spray during the application. How much of the hangar needs to be cleared becomes clear once we review the layout and the sections to be insulated. We will explain exactly what is needed when you get in touch.

Is the foam sprayed from the inside or the outside of a hangar?

It depends on the building design and access. Spraying from the inside directly onto the inner face of the sheet is easier in most cases and deals specifically with condensation. Spraying from the outside sometimes suits the construction phase or when inside access is difficult. We decide which fits after reviewing photos of the site.

What should I send you from Al Aziziyah Second District?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Aziziyah Second District, and we will work out the next step with you.

What happens to the foam under intense sun?

Foam exposed to UV degrades over time if it is not protected, so a protective top coat is a requirement and not an option. That coating takes the sun and keeps the foam beneath it intact.

Nearby areas

Hangar & warehouse insulation near Al Aziziyah Second District

If the site is outside Al Aziziyah Second District, the same service is available in Al Bandariyah District, An Nayfiyah District and Al Hufayrah District.

Other services in the area

More services in Al Aziziyah Second District

Indoor mosaic-tiled pool

In Al Aziziyah Second District and need hangar & warehouse insulation?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp