Abraj Al AzlContracting
Call العربية
Worker spraying insulating foam onto a corrugated metal roof

Corrugated-sheet (shinko) insulation in Badr

Foam bonds to the metal

Foam insulation for corrugated metal-sheet roofs on sheds, warehouses, farms and car parks

+966 54 311 2066
The service in your area

Corrugated-sheet (shinko) insulation in Badr

Corrugated-sheet insulation in Badr begins with photos of the roof sent via WhatsApp or call. The district has small storage buildings and service facilities with corrugated metal roofs needing effective heat insulation.

Most storage and service buildings in Badr have simple corrugated metal sheet roofs. These roofs heat rapidly under direct sun, and they may contain equipment or goods requiring stable temperatures. Foam is placed in the corrugations to cut heat transfer and keep interior temperature stable. The condition of the sheets and current fastening determine whether insulation can be applied at once or repairs are needed first.

  • Badr is a district in the Eastern Province, close to Ohod, An Noor and Al Manar, with small storage buildings and service facilities.
  • A corrugated metal roof on service buildings needs insulating foam that resists intense daily heat.
What the service includes

The main items of corrugated-sheet (shinko) insulation in Badr

  • Checking the sheets and locating rust and leak points
  • Cleaning the metal surface and tightening loose screws
  • Applying the protective coat over the foam to shield it from the sun
  • Treating rust before spraying so the foam bonds correctly
How we work

From first contact to the finished job in Badr

1

Send photos of the roof

On WhatsApp: photos of the sheets from outside and inside where possible, any rust, loose screws or leak stains, so we can decide the right treatment and which side to insulate from.

2

Prepare the surface and treat the rust

The sheets are cleaned of dust, dirt and grease, rust is treated and loose screws are tightened, so the foam bonds properly to the metal and does not break away later.

3

Spray the foam onto the sheets

The expanding foam is sprayed onto the sheets, filling the corrugations and the gaps at the panels and the screws. It sets after expanding and forms a rigid, continuous insulating layer bonded to the metal.

4

Apply the protective coat over the foam

The foam is covered with a protective coat that shields it from the sun and ultraviolet light, because exposed foam breaks down over time. The right material is chosen according to the roof type and the method used.

What sets us apart

Why Abraj Al Azl?

Less heat from the first dayFoam bonded to the metal stops the direct heat transfer, and those inside the space notice the difference from the start.

Badr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Badr comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on corrugated-sheet (shinko) insulation in Badr

Can an old shinko roof in Badr be insulated or must it be replaced?

In many cases an old roof can be insulated if the metal sheets are sound and securely fastened. Photos show the roof's condition; if we find rust or large holes we will tell you what needs repair first.

Does foam insulation help reduce electricity use in air-conditioned storage buildings in Badr?

Yes, cutting heat entry means cooling systems work more efficiently and use less energy. Send us photos of the store so we can choose the right foam thickness.

How do I request corrugated-sheet (shinko) insulation in Badr?

Call us, or send clear photos of the spot and its location in Badr on WhatsApp, and we will work out the next step with you.

Can a corrugated-sheet roof on an open-sided warehouse be insulated?

Yes, insulating the sheet roof does not require the sides to be closed. The aim is to stop the heat coming through the metal roof itself, and that is possible regardless of whether the sides are open. Send photos of the roof and the structure so we can see the right way to reach it.

What decides the cost of insulating a corrugated-sheet roof?

The area of the roof, the condition of the sheets and the extent of the rust, whether the insulation goes on from above or below, and how easily the site can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment and what it involves.

Does foam hold on metal in intense heat?

The foam withstands intense heat once it has set, but it breaks down if left exposed to the sun. That is why the process is not complete without the protective coat on top, which shields it from ultraviolet light and extends its life considerably.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Ohod, An Noor (near Ohod) and Al Manar (near Dammam).

Other services in the area

More services in Badr

White insulated dome on a roof among the houses

In Badr and need corrugated-sheet (shinko) insulation?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp