
Corrugated-sheet (shinko) insulation in As Sikak
Corrugated-sheet insulation in As Sikak starts with photos of the corrugated metal roof and its surroundings, sent by call or WhatsApp. As Sikak is a small village with scattered farms and homes, and many of its roofs are metal sheeting.
In As Sikak farms and homes are spread apart, and many sheds and small stores have metal roofs with no insulation. These roofs take direct heat at midday, which passes easily into the interior. Insulating widely spaced roofs depends on the size of each building and the condition of its sheets, so the photos set the order of work.
- As Sikak is a village in the Eastern Province near Salwa, Mehdar and Al Batha, with widely spaced farms and homes.
- A small store with a metal roof holds the day's heat until evening because bare metal does not insulate.
The corrugated-sheet (shinko) insulation work in As Sikak
- Spraying expanding foam to fill the corrugations and the gaps between panels
- Cleaning the metal surface and tightening loose screws
- Applying the protective coat over the foam to shield it from the sun
- Checking the sheets and locating rust and leak points
From first contact to the finished job in As Sikak
Send photos of the roof
On WhatsApp: photos of the sheets from outside and inside where possible, any rust, loose screws or leak stains, so we can decide the right treatment and which side to insulate from.
Prepare the surface and treat the rust
The sheets are cleaned of dust, dirt and grease, rust is treated and loose screws are tightened, so the foam bonds properly to the metal and does not break away later.
Spray the foam onto the sheets
The expanding foam is sprayed onto the sheets, filling the corrugations and the gaps at the panels and the screws. It sets after expanding and forms a rigid, continuous insulating layer bonded to the metal.
Apply the protective coat over the foam
The foam is covered with a protective coat that shields it from the sun and ultraviolet light, because exposed foam breaks down over time. The right material is chosen according to the roof type and the method used.
Why Abraj Al Azl?
Less heat from the first dayFoam bonded to the metal stops the direct heat transfer, and those inside the space notice the difference from the start.
Your request from As Sikak comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from As Sikak with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Common questions on corrugated-sheet (shinko) insulation in As Sikak
Is corrugated-sheet insulation right for small stores in As Sikak?
Often yes, since a store with a metal roof keeps the heat for a long time. We decide from the store's size and what is kept in it, and the photos will show what fits.
How is a spread-out farm in As Sikak handled?
We treat each building separately and start with the one that needs insulation most. Send photos of every pen and store and we will order the work with you by priority.
Can a corrugated-sheet roof on an open-sided warehouse be insulated?
Yes, insulating the sheet roof does not require the sides to be closed. The aim is to stop the heat coming through the metal roof itself, and that is possible regardless of whether the sides are open. Send photos of the roof and the structure so we can see the right way to reach it.
Does the foam stop rain dripping inside the shed?
The foam fills the corrugations and the gaps around the screws where water usually gets in. If the leak is from holes or from roof joints, each point is treated before or during spraying depending on how large the opening is. Send photos of the leak points so we can say how each one will be handled.
Must the rust be treated before the foam is sprayed?
Yes. Rust stops the foam bonding properly to the metal and can make the layer detach later. The rust is treated and the surface cleaned thoroughly before spraying. If the rust is extensive, we will flag that from the photos before the work starts.
Do you offer corrugated-sheet (shinko) insulation in As Sikak?
Yes. As Sikak is within our service area in the Eastern Province, and we also work in Salwa, Mehdar and Al Batha. Call us or send photos of the spot on WhatsApp.
More services in As Sikak




