
Corrugated-sheet (shinko) insulation in Al Asimah District
Corrugated-sheet insulation in Al Asimah District begins with sending photos of the corrugated metal roof by WhatsApp or phone. The district has diverse buildings including shops, workshops and storage sheds with corrugated metal roofs, and the long, intense summer makes cooling these spaces urgent. Foam provides effective thermal insulation and reduces water ingress.
Al Asimah has a mix of small workshops, shops and storage sheds with corrugated metal roofs, many of them older or regularly modified. An exposed corrugated metal roof gets very hot during the day and damp can form underneath at night and early morning. Foam insulation eases temperature swings and protects from water seeping in when rain falls; your photos help identify the best placement for the foam.
- Al Asimah District is a district in Al-Ahsa, Eastern Province, close to Al Jawharah, Al Hamra Third and Al Muhandisin.
- The temperature difference between the outside and inside surfaces of a metal sheet can be very large, increasing the need for cooling.
What the service covers in Al Asimah District
- Sealing the insulation at roof joints and around screws
- Spraying expanding foam to fill the corrugations and the gaps between panels
- Checking the sheets and locating rust and leak points
- Applying the protective coat over the foam to shield it from the sun
The steps of corrugated-sheet (shinko) insulation in Al Asimah District
Send photos of the roof
On WhatsApp: photos of the sheets from outside and inside where possible, any rust, loose screws or leak stains, so we can decide the right treatment and which side to insulate from.
Prepare the surface and treat the rust
The sheets are cleaned of dust, dirt and grease, rust is treated and loose screws are tightened, so the foam bonds properly to the metal and does not break away later.
Spray the foam onto the sheets
The expanding foam is sprayed onto the sheets, filling the corrugations and the gaps at the panels and the screws. It sets after expanding and forms a rigid, continuous insulating layer bonded to the metal.
Apply the protective coat over the foam
The foam is covered with a protective coat that shields it from the sun and ultraviolet light, because exposed foam breaks down over time. The right material is chosen according to the roof type and the method used.
Why Abraj Al Azl?
Less heat from the first dayFoam bonded to the metal stops the direct heat transfer, and those inside the space notice the difference from the start.
Start from Al Asimah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Corrugated-sheet (shinko) insulation in Al Asimah DistrictWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book corrugated-sheet (shinko) insulation in Al Asimah District
Does foam insulation reduce how hot it gets inside a workshop or shop?
Yes, foam significantly reduces heat transfer through the metal sheet. The actual temperature drop depends on foam thickness, other ventilation and weather, but most buildings see a noticeable improvement.
Must an old corrugated metal roof be removed before adding foam?
Not necessarily. In most cases foam is laid directly over the existing roof, but if the roof is severely cracked or sagging, some removal or prior repair may be needed. Your photos and a phone conversation show whether that is required.
Can a corrugated-sheet roof on an open-sided warehouse be insulated?
Yes, insulating the sheet roof does not require the sides to be closed. The aim is to stop the heat coming through the metal roof itself, and that is possible regardless of whether the sides are open. Send photos of the roof and the structure so we can see the right way to reach it.
Is Al Asimah District within your service area?
Yes, Al Asimah District is one of the areas we work in, as are Al Jawharah District, Al Hamra Third District and Al Muhandisin District. To start, call us or message us on WhatsApp.
Must the rust be treated before the foam is sprayed?
Yes. Rust stops the foam bonding properly to the metal and can make the layer detach later. The rust is treated and the surface cleaned thoroughly before spraying. If the rust is extensive, we will flag that from the photos before the work starts.
Does foam hold on metal in intense heat?
The foam withstands intense heat once it has set, but it breaks down if left exposed to the sun. That is why the process is not complete without the protective coat on top, which shields it from ultraviolet light and extends its life considerably.
We also offer it in neighbouring areas
We also work near Al Asimah District, in Al Jawharah District, Al Hamra Third District and Al Muhandisin District.
More services in Al Asimah District




