Abraj Al AzlContracting
Call العربية
Engineer in a hard hat and high-visibility vest inspecting the facade and roof edge of a new villa

Villa pre-handover inspection in Tihamah

Inspect before you sign

Full inspection of new villas before handover, covering finishes, plumbing, the roof, electrical points and AC

+966 54 311 2066
The service in your area

Villa pre-handover inspection in Tihamah

Villa pre-handover inspection in Tihamah begins with photos and information sent by call or WhatsApp. The district has new villas in various sizes, and a full inspection before taking the keys ensures you know exactly the condition of the structure and fixtures.

Tihamah is a district with new villas on varying plots, some near older residential areas. A new villa may show cracks in walls or roof, or have plumbing and electrical connection issues not yet fixed. Pre-handover inspection records all these defects for you, so you can require the contractor to repair them before you take possession.

  • Tihamah is a district in the Eastern Province, close to Al Jamiah, Qasr Al Khalij and Hajr.
  • Villas in developing districts may face moisture from soil or groundwater, so the roof and foundation need careful checking.
What the service includes

What the service covers in Tihamah

  • Handing over a written list of findings with the location of each one
  • Checking finishes including paint, tiles, ceilings and walls
  • Checking doors and windows, their frames and the gaps around them
  • Running taps, examining drain openings and testing WCs
How we work

From first contact to the finished job in Tihamah

1

Send photos and get in touch

On WhatsApp: photos of the villa or any spot that concerns you, and let us know if a handover date has been set so we can arrange things with you.

2

Check finishes and closures

Walls, ceilings and floors are checked for cracks, voids and stains, and doors and windows are opened and closed to check frames, locks and gaps.

3

Check plumbing, electrical and AC

Taps and WCs are run, electrical points are tested, AC bases and condensate drain outlets are checked, and floor drains in the kitchen and bathrooms are examined.

4

Check the roof and waterproofing

The roof is checked for ponding, the condition of the waterproof layer, the parapet seal, AC bases and drain openings, as these are the points where finish shortfalls show up most.

What sets us apart

Why Abraj Al Azl?

A list in your hand before you signWritten findings give you a clear basis to ask the contractor for repairs before the formal handover.

Your request from Tihamah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Tihamah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty seaside pool during waterproofing
Mosaic-tiled seaside pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
Pool at night with water jets after waterproofing
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on villa pre-handover inspection in Tihamah

What if I find defects in the villa after handover in Tihamah?

Pre-handover inspection prevents this. If you check the villa before you sign for it, you will know every defect and ask the contractor to fix it before you take the keys, so you are not responsible for it afterwards.

How can I make sure the roof and pipes are sound in a new villa?

Send photos of the roof inside and out, and of the bathrooms and kitchen where the pipes are, and we will check them and tell you of any issues before you take the villa.

What should I bring or prepare before the inspection?

Bring the villa plan if you have it and any notes you have already sent the contractor. Make sure water and electricity are active in the villa on the day so we can run the taps, test the electrical points and check the AC units. Send us photos of any spot that concerns you beforehand.

Does the inspection include the roof and waterproofing?

Yes, the roof is one of the most important points to check in a new villa. We look at the condition of the waterproof layer, how well it is sealed at the parapet, the AC bases and the drain openings, and we note any spot where water might pond.

Is Tihamah within your service area?

Yes, Tihamah is one of the areas we work in, as are Al Jamiah (near Dhahran), Qasr Al Khalij and Hajr. To start, call us or message us on WhatsApp.

What does a pre-handover villa inspection cover?

The inspection covers internal and external finishes including paint, tiles and ceilings, doors and windows with their frames, plumbing and sanitary points, electrical sockets and switches, AC bases and condensate drain outlets, and the roof with its waterproof layer, parapet and drain openings. It ends with a written list of findings.

Nearby areas

The same service in nearby areas

We also work near Tihamah, in Al Jamiah (near Dhahran), Qasr Al Khalij and Hajr.

Other services in the area

More services in Tihamah

White insulated dome on a roof among the houses

Villa pre-handover inspection in Tihamah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp