Abraj Al AzlContracting
Call العربية
Engineer in a hard hat and high-visibility vest inspecting the facade and roof edge of a new villa

Villa pre-handover inspection in Salasil

Inspect before you sign

Full inspection of new villas before handover, covering finishes, plumbing, the roof, electrical points and AC

+966 54 311 2066
The service in your area

Villa pre-handover inspection in Salasil

Villa pre-handover inspection in Salasil starts with photos sent by call or WhatsApp, documenting the new construction's condition. Salasil is a village with villas, and each one needs thorough checking to confirm build quality and utilities.

Villas in Salasil sit on separate plots and face harsh climate with intense heat and wind. Inspection focuses on roof and external walls for cracks or leaks caused by extreme heat and wind. All interior systems are checked including electricity, water, drainage and cooling, and finishes, doors and windows verified. Photos give you a documented record before signing and handover.

  • Salasil is a village in the Eastern Province, close to Shari and Usayfirat, with new villas.
  • A villa on a plot in a hot, dry area may suffer heat-related cracks, so the roof and walls need careful checking.
What the service includes

The main items of villa pre-handover inspection in Salasil

  • Checking finishes including paint, tiles, ceilings and walls
  • Inspecting the roof, the waterproof layer, the parapet and the drain openings
  • Handing over a written list of findings with the location of each one
  • Running taps, examining drain openings and testing WCs
How we work

How we carry out villa pre-handover inspection in Salasil

1

Send photos and get in touch

On WhatsApp: photos of the villa or any spot that concerns you, and let us know if a handover date has been set so we can arrange things with you.

2

Check finishes and closures

Walls, ceilings and floors are checked for cracks, voids and stains, and doors and windows are opened and closed to check frames, locks and gaps.

3

Check plumbing, electrical and AC

Taps and WCs are run, electrical points are tested, AC bases and condensate drain outlets are checked, and floor drains in the kitchen and bathrooms are examined.

4

Check the roof and waterproofing

The roof is checked for ponding, the condition of the waterproof layer, the parapet seal, AC bases and drain openings, as these are the points where finish shortfalls show up most.

What sets us apart

Why Abraj Al Azl?

A list in your hand before you signWritten findings give you a clear basis to ask the contractor for repairs before the formal handover.

We serve Salasil and around itIncluding Shari, Usayfirat and Ash Shuhayla', as part of our work across the Eastern Province.

Your request from Salasil comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty seaside pool during waterproofing
Mosaic-tiled seaside pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
Pool at night with water jets after waterproofing
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on villa pre-handover inspection in Salasil

What is the difference between villa inspection and routine viewing?

Documented inspection with photos covers all systems and structures thoroughly and records any defects, while routine viewing may miss hidden issues. Comprehensive checking helps you know the villa's true condition before signing.

Is the effect of heat and wind on the villa checked in Salasil?

Yes, inspection focuses on sun and wind-exposed parts like roof and external walls for cracks and leaks. Send photos of the villa so we can assess how the building has been affected by the local climate.

What should I bring or prepare before the inspection?

Bring the villa plan if you have it and any notes you have already sent the contractor. Make sure water and electricity are active in the villa on the day so we can run the taps, test the electrical points and check the AC units. Send us photos of any spot that concerns you beforehand.

What does a pre-handover villa inspection cover?

The inspection covers internal and external finishes including paint, tiles and ceilings, doors and windows with their frames, plumbing and sanitary points, electrical sockets and switches, AC bases and condensate drain outlets, and the roof with its waterproof layer, parapet and drain openings. It ends with a written list of findings.

What do I do with the findings list you give me?

The list describes each finding and where it is in the villa, so you can hand it to the contractor and ask for each point to be fixed before handover or as a condition of it. We make no claim of legal weight for the list, but it is clear documentation that gives you a basis for the conversation.

Do you cover Salasil?

Yes. We serve Salasil and nearby areas such as Shari, Usayfirat and Ash Shuhayla', from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

We also offer villa pre-handover inspection in Shari, Usayfirat and Ash Shuhayla', among the closest areas to Salasil.

Other services in the area

More services in Salasil

White insulated dome on a roof among the houses

Tell us about your site in Salasil
and we will plan the next step with you

Describe the problem and where it is in Salasil, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp