Villa pre-handover inspection in Makkah
Villa pre-handover inspection in Makkah begins with villa photos sent via WhatsApp or call. Makkah has diverse new villas of varying sizes, and thorough pre-handover inspection ensures your building, pipes, foundation and roof are sound.
Makkah villas are new and range from small to large. Inspection focuses on foundations, wall integrity, joints between building parts, roofs, pipes, electrical points, air conditioning, doors and windows. Water leaks from roofs or external walls may occur after handover if joints are weak or cracks exist. Old or poorly installed pipes may leak and damage walls and foundations. Detailed photos from every angle give you strong documentation of any issues.
- Makkah is a district in the Eastern Province, close to Al Fanatir, Najd and Al Hijaz, with diverse new villas.
- New villas may contain foundation or wall defects that only appear after months of use and heat exposure.
The villa pre-handover inspection work in Makkah
- Inspecting the roof, the waterproof layer, the parapet and the drain openings
- Checking electrical points, AC bases and condensate drain outlets
- Checking finishes including paint, tiles, ceilings and walls
- Running taps, examining drain openings and testing WCs
This is how we work in Makkah
Send photos and get in touch
On WhatsApp: photos of the villa or any spot that concerns you, and let us know if a handover date has been set so we can arrange things with you.
Check finishes and closures
Walls, ceilings and floors are checked for cracks, voids and stains, and doors and windows are opened and closed to check frames, locks and gaps.
Check plumbing, electrical and AC
Taps and WCs are run, electrical points are tested, AC bases and condensate drain outlets are checked, and floor drains in the kitchen and bathrooms are examined.
Check the roof and waterproofing
The roof is checked for ponding, the condition of the waterproof layer, the parapet seal, AC bases and drain openings, as these are the points where finish shortfalls show up most.
Why Abraj Al Azl?
A list in your hand before you signWritten findings give you a clear basis to ask the contractor for repairs before the formal handover.
We serve Makkah and around itIncluding Al Fanatir, Najd and Al Hijaz, as part of our work across the Eastern Province.
Villa pre-handover inspection in MakkahWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Makkah
Does inspection include checking floors, tiles and paintwork?
Yes, we check floors, tiles and paintwork for cracks, damp and poor installation. Damp under tiles may appear later and cause damage. Send close photos of floors, walls and tiles.
What do you do if you find many defects in the villa?
We document each defect clearly with photos, locations and precise descriptions. A detailed report helps you demand repairs from the contractor and engineer before you sign handover documents.
What does a pre-handover villa inspection cover?
The inspection covers internal and external finishes including paint, tiles and ceilings, doors and windows with their frames, plumbing and sanitary points, electrical sockets and switches, AC bases and condensate drain outlets, and the roof with its waterproof layer, parapet and drain openings. It ends with a written list of findings.
What decides the cost of a villa inspection?
The cost depends on the size of the villa, the number of floors, the number of rooms and bathrooms, how accessible the roof is, the condition of the finishes, and whether there are any areas that need particular attention. Send us photos and details of the villa on WhatsApp and we will give you the specifics.
What should I bring or prepare before the inspection?
Bring the villa plan if you have it and any notes you have already sent the contractor. Make sure water and electricity are active in the villa on the day so we can run the taps, test the electrical points and check the AC units. Send us photos of any spot that concerns you beforehand.
What should I send you from Makkah?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Makkah, and we will work out the next step with you.
The same service in nearby areas
We also work near Makkah, in Al Fanatir, Najd and Al Hijaz.
More services in Makkah